House 9x12 with attic glued laminated timber. Houses with an attic made of glued laminated timber. Attic rooms are the brightest

Houses made of glued laminated timber with an attic have received great recognition in the domestic market. The second floor, combined with the roof, not only simplifies construction, but also gives a special comfort.

Advantages of housing with an attic from the company "Dachny Sezon"

  1. You will be able to move into the house after the completion of finishing work on the ground floor. Finishing the attic does not interfere with a comfortable life, as it requires minimal effort.
  2. The design of this home is reminiscent of cozy houses, which many have dreamed of since childhood. Desire, embodied in reality, a cozy nest for the whole family, your own piece of heaven on earth. You will get all this and more.
  3. Projects of houses with an attic made of glued laminated timber in high-tech style combine the best features of the classics and modern style. Functional, innovative and comfortable. At the same time, they do not lose that very note of warmth that permeates every wall of classic houses.
  4. The price of building a turnkey project will not hit the wallet. During the construction process, there is no need to use large equipment, and most of the materials are delivered to the site in finished form. All that is required from builders is to assemble a structure from a variety of components.

    What was done

    Project: the Innsbruck project was adapted to the site and the wishes of the Customer's family, a decision was made to relocate the terrace.
    foundation: based on geology and the architect's calculations, the house was built on a pile-grillage foundation.
    ceilings: basement - reinforced concrete monolithic; interfloor - reinforced concrete floor slabs.
    box: walls made of aerated concrete blocks, laying with masonry glue. Windows are made to order, with one-sided lamination, installation on site.
    roof: metal tile.
    exterior finish: walls are insulated with basalt facade insulation and plastered, finishing elements are made of wood, made on site, based on TK-visualization, painted. Plinth laid out decorative stone.
    interior decoration: the decoration was carried out according to the design project, where the combination of decorative plaster with stone and wood was taken as the basis. False beams were mounted on the ceilings.
    additionally: a fireplace is installed and finished.

    What was done

    The very case when our Customer and we speak the same language and are inspired by the ECO high-tech style! Designer Ilya came to us with a ready Project of his future home! Our team liked the project - after all, such unusual and stylish solutions are always a professional challenge!
    We prepared estimates for Ilya and developed unique Constructive decisions- all this allowed us to implement this project! Frame house made in our proven Canadian technology with 200 mm insulation around the entire contour! Outside, the house is sheathed with imitation timber. All windows are custom-made and laminated in colors according to the project. Additional accents are placed thanks to the professional coloring of imitation timber and the selection of colors.

    What was done

    What does it cost us to build a house? Indeed, having a team of professionals and knowledge - building a house from scratch is a matter of time! But sometimes the task is more difficult! We have introductory - an existing foundation, or buildings on the site, extensions to existing buildings and much more! For the Matsuev family, it was precisely such a difficult task. They had a foundation from an old burnt house, and a landscaped area around it! The new house had to be built in short term on the existing foundation. Dmitry and his family had a desire to build new house in hi-tech style. After careful measurements, a project was made that took into account the old layout, but had a new one. modern form with exciting updates! The house has appeared entry group, where you can sit at a table in cozy evenings and a complex but possible exploited roof in our lane. To implement such a roof, we called on our knowledge and modern Construction Materials LVL beams, welded roofing and more. Now in the summer on such a roof you can arrange an unusual dinner or watch the stars at night! In the decoration, our architect also emphasized the minimalist and graphic high-tech style. Smooth stucco walls with painted planken details add personality to the wooden beams at the entrance. Inside, the house is finished with imitation timber, which is painted in different colors depending on the purpose of the room! Large windows in the living room kitchen overlooking the plot - created the desired effect of illumination and airiness of the space! The house of the Matsuev family has graced our photo gallery in the country architecture section in high-tech style, in the style chosen by bold Customers with excellent taste.

    What was done

    Olga and her family have long dreamed of a country house! A reliable, solid home to live in, which will fit perfectly into their difficult narrow lot! With the advent of children, it was decided to realize the dream, children grow up quickly and in own house nature has many possibilities and Fresh air. We, in turn, were happy to work on an individual project at home in classical style from red brick with a bay window! After the first acquaintance with our company in a cozy office, we invited Olga to take a look at our existing construction site: evaluate the order and construction processes, store materials on the site, get acquainted with the construction team, make sure the quality of work. After visiting the facility, Olga decided to work with us! And we were happy to do our favorite work again to make another country dream come true!

    What was done

    Project: changes were made to the San Rafael project and redevelopment was made according to the wishes of the Customer.
    ceilings: basement - reinforced concrete floor slabs; interfloor - reinforced concrete floor slabs
    box: walls made of expanded clay concrete blocks, mortar masonry??? Windows inserted.
    roofing: metal tile
    terrace: rough enclosing elements are made, flooring is done.

    What was done

    Dmitry approached our company with an interesting draft design to calculate the cost. Our experience allows us to perform such calculations according to draft designs with minimal errors, no more than 2%. Having visited our construction sites and received the cost of construction, Dmitry chose us from among many of our colleagues in the shop to complete the project. Our team has embarked on a complex and expressive country project with spacious premises and a garage, large windows and complex architecture. After the delivery of the project, Dmitry chose us as a contractor company, and we, in turn, wanted to do further work on the same high level! Since the object is large, Dmitry proposed a phased cooperation, namely, upon successful completion of the foundation work, we proceeded to the second part of the project - walls + ceilings + roofing. Also, the exact timing of construction was important for Dmitry, in order to speed up the construction processes, the team was reinforced by 2 experienced masons.
    The box on a pile-grillage foundation was handed over right on time! The result pleased us and the Customer. All stages of work were coordinated and worked out for Dmitry and his individual project, from which all participants in the process benefited!

    What was done

    Project: The project of our company Inkerman was changed taking into account the wishes of the Customer's family, the house was planted on the site, taking into account the existing situation on the site and the relief
    foundation: based on geology and the architect's calculations, the house was built on a reinforced pile-grillage foundation.
    ceilings: wooden wooden beams, in places of large spans installation of LVL beams. The basement is insulated basalt insulation in 200mm; interfloor overlap with sound insulation 150mm.
    box: box: walls made of expanded clay concrete blocks, mortar masonry. Windows inserted.
    roofing: installation of metal tiles.
    exterior finish: the facade is insulated with 100 mm basalt facade slabs, the facades are covered with facing bricks; color solution proposed by the architect and agreed with the customer.

    What was done

    The Krutov family decided to build a spacious house for the whole family!
    From the idea to its implementation, Olga and other family members went through several stages! The choice of technology, the long work on the project, the construction of the foundation, the construction of the house with the exterior and then the work on the interior! The frame technology was chosen as energy-saving, prefabricated and high-tech! Why did the Krutovs choose our company? They liked the quality of work at our construction site and the workers who gave a detailed tour! We also worked on the estimate for a long time, combining different variants finishes, comparing their cost. This made it possible to choose best option from a wide variety finishing materials and kits.
    The project was created by an architect friend, but we had to work out the constructive part of it. After that, the most reliable and effective foundation was erected - UWB. Then work began on the box. A frame house with 200 mm insulation along the entire contour and a unique 300 mm roof insulation technology. For the exterior, siding was chosen in a spectacular combination of colors - coffee and cream. The accents are placed thanks to the powerful roof overhangs, interfloor belt and large windows!

    What was done

    When you decide to become happy owner own house and move to a new house for permanent residence, first of all you think about what kind of house it will be; what to build it from; how much will it cost and most importantly, WHO will do all this?
    Alexander, came to our company with the desire to move to his own Vacation home. He liked the Avignon project and there was already a strip foundation. After the initial visit to the site, measurements and examination of the foundation, we gave our conclusions and recommendations. Strengthen the foundation, change the project and adapt it to the dimensions of the existing foundation! After agreeing on the cost, it was decided to build in the winter. Alexander received as a gift reinforced concrete floors, one of the leading construction teams and a house according to the project he liked, which stood on the site with exterior decoration by spring! Alexander watched every stage of construction, regularly visiting the construction site and was pleased with the result, and we were satisfied with our work. This is an individually designed Avignon project, implemented in stone technology with external insulation and siding!

    What was done

    Each house is a separate story of creation and implementation! Once we built a house good people and they recommended us to another nice person! Rumyantsev Andrey came to our company with a desire to replace the old country house to build a one-story spacious country house with a fireplace for warm family evenings... It was decided to build the house from aerated concrete blocks so that the future country handsome man would please the owner for decades! The customer voiced his wishes for finishing - and we, in turn, brought everything to life. Thanks to the detailed visualization of the project, each element of the exterior decoration is a member of a friendly ensemble! Bavarian masonry, as the final stage of exterior decoration, looks noble and thorough. Without a doubt, such a tandem - aerated concrete and brick can be safely called best solution in the field of stone housing construction - warm, affordable, beautiful, reliable. Modern technologies we have stepped forward so much that such unique configurations become available in a short time, because we built this project during the winter months. The main thing is to have the necessary knowledge and constantly replenish their stock!

    What was done

    Project: the project of a European company was taken as a basis and was adapted to the site and the wishes of the Customer's family, a terrace and a patio were proposed, taking into account the cardinal directions on the Customer's site.
    foundation: based on geology and the architect's calculations, the house was built on a pile-grid foundation.
    ceilings: basement - reinforced concrete monolithic; interfloor - wooden on beams with a sound insulation device of 150 mm.
    box: walls made of aerated concrete blocks, laying with masonry glue. Windows are made to order with one-sided lamination, installation on site.
    roof: metal tile.
    exterior finish: the walls are insulated with basalt facade insulation and plastered. Based on the visualization, facade panels were added under the Tolento stone. The enclosing elements of the terrace, balcony made of wood, made on site, based on the TK-visualization, painted. Roof overhangs are hemmed with spotlights in the color of the roof.

    Vladimir Murashkin,

    The owner of the house "individual 8x9m"

    House options:

    What was done

    When Customers come to us with bright, modern ideas future home, we light up doubly! After all, working on a new stylish project is always interesting and a challenge, how to implement all the bold ideas from a constructive point of view, what materials to use? Vladimir bought a plot with picturesque views of the Oka River! Such a view could not be ignored, so a dizzying terrace (51.1 m2) and a large balcony, focused on beauty, became an indispensable attribute of the future home! Vladimir wanted to relax in nature in wooden house, and it was necessary to build a house in a short time and ideal solution for such tasks has become a frame construction technology! If we are different, then in everything! The house was made even more spectacular by the vertical finish with an imitation of durable larch timber, painted in natural shades with an accentuated wood texture. Complement the modern look of the house - windows with lamination! It turned out to be an excellent country house, with zest and at the same time incredibly functional.

A house made of timber with an attic is an elegant structure that any land owner wants to see. Such a building is the envy of colleagues and acquaintances, and thanks to the profiled timber it is considered environmentally friendly.

In this article, we will discuss the obvious advantages and obvious disadvantages of a one-story cottage with an attic, and talk about the key stages in the construction of such a building.

Attic: what is it?

The attic floor is a room located under the roof itself and equipped for living. Due to structural limitations, this room has sloping walls. The layout of the attic is unusual. It is created taking into account the angle of inclination of the roof beams.

Thanks to high-quality building materials and multilayer insulation, attic spaces are warm and cozy. They have a romantic flair, as poets, artists and writers often lived in the attic.

Despite this, a room under a roof is usually used in warm weather. With the onset of frost, it is cold in it.

Projects of garages and baths can be supplemented attic floor. This allows you to solve issues with additional living space.

The main stages of building a cottage with an attic

The whole process of building a house with an additional attic floor is divided into several important steps.

  • foundation pouring;

A cottage without a full-fledged second floor does not create a large load on the ground, so a simple strip foundation is enough.

  • Installation of main walls and interior ceilings;

A short period of construction. Takes 2-3 weeks for a 6x6 or 6x8 house. Larger country cottages are assembled within a month. Wooden interior partitions are easy to install. If necessary, they can be moved from place to place, changing the configuration of the room.

  • Roof assembly;

An important part of the building. The integrity of the entire structure, as well as the size of the attic, depends on it.

  • Insulation of the roof and main walls.

Roll insulation will make the building comfortable for living. You can not save on the quality of insulation and then the house can be used all year round.

The attic floor is usually used as a summer bedroom, a nursery or a rest room. If the superstructure was made over the garage, then the men organize a workshop or a billiard room there.

built country house on frame technology plus a small veranda. The cost came out quite economically, and in terms of 3 and a half months. Finished even a couple of weeks earlier than promised. We go to the country house only in the summer, so I can’t say anything about thermal insulation. Thank you

Thank you so much for building a house of aerated concrete. The quality of both material and work is excellent - FRIENDS ENVY. The terms of the work performed - in about 4.5 months a house was built from scratch. Good luck to you all, good clients and big houses!!


They built a house for us in 3 months (they started the foundation at the end of summer, and in the fall they finished the walls and interior decoration), it turned out not cheap, but everything was thought out, our participation was minimal. This year we are building a bathhouse with them! Thank you for such professional guys that you provided us!


Thank you so much for your hard work and dedication! Everything is prompt, high-quality, fast! Thanks to the team led by Alexei!


The company built a great summer house for me! I have no complaints about the company, next summer I am going to build a bathhouse and a garage, I will definitely contact them. Thanks to everyone, especially Sergey's team, which built for me, a lot depends on them!


We built a house of aerated concrete in your company - very satisfied. A house was built on our pre-prepared foundation in 45 days. And as a gift received home insurance for a year. So I recommend.


In August 2017, I ordered a foundation (monolithic slab) for a house in the Leningrad region. In 2018, I already ordered the house itself. I can recommend, because were satisfied with the result. Everything was done quickly and professionally.


We ordered a house and a garage in this company in the summer of 2016. The builders worked for about 4 months without a break (they liked it very much). Everything was done according to the contract, no extra money was asked.


Frequently asked questions before construction

About company

How long has your company been operating?

Our company began work as a repair and finishing company in 2007. From that moment we have grown to the construction industry and all thanks to our employees. Special thanks for the work invested in the development of the company.

What confirms the competence of specialists?

All architects and engineers of the company have qualification certificates. Because the project is not accompanied by a company license, but by an architect's certificate. By law, the architect is responsible for the project.

Does your company do all the work? Or are you hiring contractors?

  • We ourselves carry out general construction, Finishing work, site arrangement, wiring of engineering systems (electricity, heating around the house, water supply) and so on.
  • We invite contractors to work that we do not perform every day and require specialization, for example: the production and installation of windows and doors (special orders), air conditioning systems, boiler room equipment, installation of wells, septic tanks.
  • Search, attraction, compliance with agreements and control over the performance of work by contractors is our task.
  • We carry out 80% of all works on the construction of your house on our own and only 20% involve contractors.
  • We conclude an agreement with each contractor, in which he indicates a guarantee for the work performed by him, and in case of malfunctions, their elimination lies with the contractor.

Can I see the objects that are currently in operation?

Yes, there are objects that we can show at different stages of work and houses that have already been handed over by prior arrangement.

about the project

Buy a standard project or order an individual one?

Buy finished project.

  • The plus is the price.
  • Minus - it will not provide for all your wishes regarding materials and layouts. Also, it will require refinement for the features of your site.

Buy a finished project and modify it.

It all depends on the changes you want to make. It is possible that it will be more profitable for you to develop an individual project than to modify a typical one.

The cost of such improvements should be discussed at the meeting.

Development of an individual house project.

  • Pros: all your wishes regarding all the characteristics of the house and the site are taken into account.
  • Minus - the cost of such a project is higher than a typical one.

BUT! You can develop an individual project for free. If our company builds, then the development of an individual project is free of charge for you.

How is the development of an individual project?

  • The development of an individual project begins with the signing of the contract and the first meeting with the architects, at which the client voices his wishes. As a result of the meeting, a design task is drawn up, which is an annex to the contract.
  • Architects prepare several versions of sketches and decide with the client in which direction to move on. During the entire design period, there are several meetings with the client, at which all architectural and design solutions are worked out in detail until the client is satisfied with everything, which he confirms with a signature on the Draft Design.
  • Next, a Working Draft is being developed. This is the calculation stage of each design solution, in which the client is not involved.
  • This whole process takes from 2 weeks to 2 months, after which the client receives a finished project with ready-made detailed calculations, which is necessary when applying for a building permit.

About construction

Will you travel to the site where the construction is planned?

Yes. When inspecting the site, we take into account the dimensions, the entrance from the road and its width, the proximity of neighbors' buildings, the presence of a slope or difference, cardinal points and what kind of soil is on the site.

Do you help with the selection of a building site?

Yes. Our experts help with site selection. They will help you find it according to your requirements on the Internet with ads.

What affects the final price of a home?

The cost of building a house is affected by:

  • site features: relief, conditions of entry, location
  • materials used in construction
  • house architecture features
  • conditions for the production of work (limitations on work time)

What guarantees do you give?

We give a guarantee of 3 years for our work. The warranty is given by the manufacturer and it is different in each case. There are materials for which the manufacturer gives a lifetime warranty.

How can I control construction?

  • We send each client a step-by-step photo report of the work.
  • We install online video surveillance of the object 24 hours a day, you and the company's specialists have access to it (paid service).
  • You can also use the services of companies that carry out technical control.
  • The construction is being delivered in stages, you always see which stage and only after accepting one, we proceed to the next.

When is the contract signed?

  • The design contract is signed at the meeting, before the first communication with the architect.
  • The construction contract is signed after the development and approval of the estimate.

When do I have to pay for your work?

For design, an advance payment must be made within 5 days after signing the contract in the amount of 70% of the total amount. The balance is paid when the finished project is handed over to the client.

Payment for construction is broken down according to the stages that are specified in the estimate. Each stage of construction is also divided into payments, the amount of which may be different (usually this is due to the need to purchase materials)

How are builders placed?

  1. It will be convenient if you have the opportunity to place builders next to the construction site, suitable garden house, construction trailer, old house or any other building with a roof.
  2. If there is nothing like that, then we are ready to bring our change house for FREE.
  3. In extreme cases, we will place our builders in a nearby hostel

What communications are needed to start construction: electricity, water?

Electricity with a capacity of at least 5 kW and technical water.

If not, we will bring our generators for FREE. Water in most cases wooden construction used only for domestic needs, we will provide its delivery on our own.

What time of year do you build?

We build all year round, one of the important conditions in the spring-autumn period is a suitable road for vehicle access.

WHAT CAN WE DO FOR YOU?

We will help you save money by correctly calculating the estimate and choosing high-quality materials.

Run a quality project documentation, thanks to which you can not worry about the design decisions made.

We work throughout the Moscow region

Volokolamsky district, Voskresensky district, Dmitrovsky district, Egorevsky district, Zaraisky district, Istra district, Kashirsky district, Klinsky district, Kolomna district, Krasnogorsky district, Leninsky district, Lotoshinsky district, Lukhovitsky district, Luberetsky district, Mozhaysky district, Mytishchi district, Naro-Fominsk district, Noginsky district, Odintsovsky district -n, Ozersky district, Orekhovo-Zuevsky district, Pavlovsky Posadsky district, Podolsky district, Pushkinsky district, Ramensky district, Ruzsky district, Sergiev Posadsky district, Serebryano -Prudsky district, Serpukhov district, Solnechnogorsk district, Stupinsky district, Taldom district, Chekhov district, Shatursky district, Shakhovskoy district, Schelkovsky district.

In the company "SVDOM" (Moscow) you can order the design and construction of a house from glued laminated timber with a terrace. The terrace is a great place for relaxing in the warm season, playing sports, as well as a summer dining room. This is an auxiliary building and architectural structure adjacent to the building, which can be:

  • open;
  • closed;
  • universal.

In the autumn-spring period, it will protect the house from street dirt and dust. You can lay a rug on it and equip it with a shoe shine device, which will eliminate the appearance of puddles in the hallway. Thanks to the roof, the veranda will be able to shade the windows that face south.

Terrace types

Open areas are distinguished by location, shape, levels, presence or absence of a roof, fence.

The open type option is a summer building. It is carried out on the foundation and may have a canopy. covered terrace built with a foundation and main walls. In such a building it is possible to carry out heating and ventilation system. This makes it functional for any season.

Another type is a universal veranda, the design of which allows it to be transformed into an open type. Universal terraces also have a foundation. It is carried out using "lightweight" technology, compared with the main foundation of the house.

The company's specialists will turn any idea into reality. In the company, you can order not only a standard project, but also choose to create a house with an open area with a rooftop balcony and other design ideas.

Up