One-story houses from foam blocks up to 100 sq. m. Houses from foam blocks. Buy a finished project

In conditions of dense development of suburban cottage settlements, the project of a house made of foam concrete blocks up to 100 m2 meters is the best solution. Such houses are small, but compact, if desired, they can be one- or two-story. If you are not satisfied standard solutions, you can order the design and construction of a house according to the original project.

A country house made of foam blocks is superior in reliability to a brick one, and in terms of environmental comfort it is not inferior to a wooden one. It is a lightweight building material with a porous structure that does not require the construction of a heavy foundation, which saves the overall budget. A house made of foam blocks will be durable, strong and outwardly attractive, and due to the good breathability of the material, there will always be a comfortable microclimate in the room. Another plus of the material is excellent thermal insulation and fire resistance.

At the stage of designing a house from foam blocks up to 100 sq m, we adapt each project to the building region, taking into account climatic conditions and soil features.

    What was done

    Project: the Innsbruck project was adapted to the site and the wishes of the Customer's family, a decision was made to relocate the terrace.
    foundation: based on geology and the architect's calculations, the house was built on a pile-grillage foundation.
    ceilings: basement - reinforced concrete monolithic; interfloor - reinforced concrete floor slabs.
    box: walls made of aerated concrete blocks, laying with masonry glue. Windows are made to order, with one-sided lamination, installation on site.
    roof: metal tile.
    exterior finish: walls are insulated with basalt facade insulation and plastered, finishing elements are made of wood, made on site, based on TK-visualization, painted. Plinth laid out decorative stone.
    interior decoration: the decoration was carried out according to the design project, where the combination of decorative plaster with stone and wood was taken as the basis. False beams were mounted on the ceilings.
    additionally: a fireplace is installed and finished.

    What was done

    The very case when our Customer and we speak the same language and are inspired by the ECO high-tech style! Designer Ilya came to us with a ready Project of his future home! Our team liked the project - after all, such unusual and stylish solutions are always a professional challenge!
    We prepared estimates for Ilya and developed unique Constructive decisions- all this allowed us to implement this project! Frame house made in our proven Canadian technology with 200 mm insulation around the entire contour! Outside, the house is sheathed with imitation timber. All windows are custom-made and laminated in colors according to the project. Additional accents are placed thanks to the professional coloring of imitation timber and the selection of colors.

    What was done

    What does it cost us to build a house? Indeed, having a team of professionals and knowledge - building a house from scratch is a matter of time! But sometimes the task is more difficult! We have introductory - an existing foundation, or buildings on the site, extensions to existing buildings and much more! For the Matsuev family, it was precisely such a difficult task. They had a foundation from an old burnt house, and a landscaped area around it! The new house had to be erected in a short time on the existing foundation. Dmitry and his family had a desire to build new house in hi-tech style. After careful measurements, a project was made that took into account the old layout, but had a new one. modern form with exciting news! The house has appeared entry group, where you can sit at a table in cozy evenings and a complex but possible exploited roof in our lane. To implement such a roof, we called on our knowledge and modern Construction Materials LVL beams, welded roofing and more. Now in the summer on such a roof you can arrange an unusual dinner or watch the stars at night! In the decoration, our architect also emphasized the minimalist and graphic high-tech style. Smooth stucco walls with painted planken details add personality to the wooden beams at the entrance. Inside, the house is finished with imitation timber, which is painted in different colors depending on the purpose of the room! Large windows in the living room kitchen overlooking the plot - created the desired effect of illumination and airiness of the space! The house of the Matsuev family has graced our photo gallery in the country architecture section in high-tech style, in the style chosen by bold Customers with excellent taste.

    What was done

    Olga and her family have long dreamed of a country house! A reliable, solid home to live in, which will fit perfectly into their difficult narrow lot! With the advent of children, it was decided to realize the dream, children grow up quickly and in own house nature has many possibilities and Fresh air. We, in turn, were happy to work on an individual project at home in classical style from red brick with a bay window! After the first acquaintance with our company in a cozy office, we invited Olga to take a look at our existing construction site: evaluate the order and construction processes, store materials on the site, get acquainted with the construction team, make sure the quality of work. After visiting the facility, Olga decided to work with us! And we were happy to do our favorite work again to make another country dream come true!

    What was done

    Project: changes were made to the San Rafael project and redevelopment was made according to the wishes of the Customer.
    ceilings: basement - reinforced concrete floor slabs; interfloor - reinforced concrete floor slabs
    box: walls made of expanded clay concrete blocks, mortar masonry??? Windows inserted.
    roofing: metal tile
    terrace: rough enclosing elements are made, flooring is done.

    What was done

    Dmitry approached our company with an interesting draft design to calculate the cost. Our experience allows us to perform such calculations according to draft designs with minimal errors, no more than 2%. Having visited our construction sites and received the cost of construction, Dmitry chose us from among many of our colleagues in the shop to complete the project. Our team has embarked on a complex and expressive country project with spacious premises and a garage, large windows and complex architecture. After the delivery of the project, Dmitry chose us as a contractor company, and we, in turn, wanted to do further work on the same high level! Since the object is large, Dmitry proposed a phased cooperation, namely, upon successful completion of the foundation work, we proceeded to the second part of the project - walls + ceilings + roofing. Also, the exact timing of construction was important for Dmitry, in order to speed up the construction processes, the team was reinforced by 2 experienced masons.
    The box on a pile-grillage foundation was handed over right on time! The result pleased us and the Customer. All stages of work were coordinated and worked out for Dmitry and his individual project, from which all participants in the process benefited!

    What was done

    Project: The project of our company Inkerman was changed taking into account the wishes of the Customer's family, the house was planted on the site, taking into account the existing situation on the site and the relief
    foundation: based on geology and the architect's calculations, the house was built on a reinforced pile-grillage foundation.
    ceilings: wooden wooden beams, in places of large spans installation of LVL beams. The basement is insulated basalt insulation in 200mm; interfloor overlap with sound insulation 150mm.
    box: box: walls made of expanded clay concrete blocks, mortar masonry. Windows inserted.
    roofing: installation of metal tiles.
    exterior finish: the facade is insulated with 100 mm basalt facade slabs, the facades are covered with facing bricks; color solution proposed by the architect and agreed with the customer.

    What was done

    The Krutov family decided to build a spacious house for the whole family!
    From the idea to its implementation, Olga and other family members went through several stages! The choice of technology, a long work on the project, the construction of the foundation, the construction of a house with exterior finishes and then work on interior decoration! The frame technology was chosen as energy-saving, prefabricated and high-tech! Why did the Krutovs choose our company? They liked the quality of work at our construction site and the workers who gave a detailed tour! We also worked on the estimate for a long time, combining different variants finishes, comparing their cost. This made it possible to choose best option from a wide variety of finishing materials and trim levels.
    The project was created by an architect friend, but we had to work out the constructive part of it. After that, the most reliable and effective foundation was erected - UWB. Then work began on the box. A frame house with 200 mm insulation along the entire contour and a unique 300 mm roof insulation technology. For the exterior, siding was chosen in a spectacular combination of colors - coffee and cream. The accents are placed thanks to the powerful roof overhangs, interfloor belt and large windows!

    What was done

    When you decide to become happy owner own house and move to a new house for permanent residence, first of all you think about what kind of house it will be; what to build it from; how much will it cost and most importantly, WHO will do all this?
    Alexander, came to our company with the desire to move to his own Vacation home. He liked the Avignon project and there was already a strip foundation. After the initial visit to the site, measurements and examination of the foundation, we gave our conclusions and recommendations. Strengthen the foundation, change the project and adapt it to the dimensions of the existing foundation! After agreeing on the cost, it was decided to build in the winter. Alexander received as a gift reinforced concrete floors, one of the leading construction teams and a house according to the project he liked, which stood on the site with exterior decoration by spring! Alexander watched every stage of construction, regularly visiting the construction site and was pleased with the result, and we were satisfied with our work. This is an individually designed Avignon project, implemented in stone technology with external insulation and siding!

    What was done

    Each house is a separate story of creation and implementation! Once we built a house for good people and they recommended us to someone else good man! Rumyantsev Andrey came to our company with a desire to replace the old country house to build a one-story spacious country house with a fireplace for warm family evenings... It was decided to build the house from aerated concrete blocks so that the future country handsome man would please the owner for decades! The customer voiced his wishes for finishing - and we, in turn, brought everything to life. Thanks to the detailed visualization of the project, each element of the exterior decoration is a member of a friendly ensemble! Bavarian masonry, as the final stage of exterior decoration, looks noble and thorough. Without a doubt, such a tandem - aerated concrete and brick can be safely called best solution in the field of stone housing construction - warm, affordable, beautiful, reliable. Modern technologies stepped forward so much that such unique configurations become available in short time, because we built this project during the winter months. The main thing is to have the necessary knowledge and constantly replenish their stock!

    What was done

    Project: the project of a European company was taken as a basis and was adapted to the site and the wishes of the Customer's family, a terrace and a patio were proposed, taking into account the cardinal directions on the Customer's site.
    foundation: based on geology and the architect's calculations, the house was built on a pile-grid foundation.
    ceilings: basement - reinforced concrete monolithic; interfloor - wooden on beams with a sound insulation device of 150 mm.
    box: walls made of aerated concrete blocks, laying with masonry glue. Windows are made to order with one-sided lamination, installation on site.
    roof: metal tile.
    exterior finish: the walls are insulated with basalt facade insulation and plastered. Based on the visualization, facade panels were added under the Tolento stone. The enclosing elements of the terrace, balcony made of wood, made on site, based on the TK-visualization, painted. Roof overhangs are hemmed with spotlights in the color of the roof.

    Vladimir Murashkin,

    The owner of the house "individual 8x9m"

    House options:

    What was done

    When Customers come to us with bright, modern ideas future home, we light up doubly! After all, working on a new stylish project is always interesting and a challenge, how to implement all the bold ideas from a constructive point of view, what materials to use? Vladimir bought a plot with picturesque views of the Oka River! Such a view could not be ignored, so a dizzying terrace (51.1 m2) and a large balcony, focused on beauty, became an indispensable attribute of the future home! Vladimir wanted to relax in nature in wooden house, and it was necessary to build a house in a short time and ideal solution for such tasks has become a frame construction technology! If we are different, then in everything! The house was made even more spectacular by the vertical finish with an imitation of durable larch timber, painted in natural shades with an accentuated wood texture. Complement the modern look of the house - windows with lamination! It turned out to be an excellent country house, with zest and at the same time incredibly functional.

Company " Summer Season» builds houses from foam blocks on a turnkey basis in Moscow and the Moscow region according to ready-made and individual projects. In a short time we build warm, reliable and durable buildings. The minimum life of the cottage is 70-80 years, and with strict observance of the construction technology, the house will last more than a century.

Construction features

Foam block - molded cellular concrete, made from a mixture of sand, cement and water with the addition of a foaming agent. It has a homogeneous porous structure with closed pores isolated from each other. Due to this, the material has thermal conductivity and vapor permeability that are not inferior to natural wood. Foam block houses "breathe", independently regulate the humidity in the room, maintaining a comfortable microclimate. They are light weight, rodent and insect resistant, fire retardant and compatible with all interior and exterior finishing materials. Over the years, the strength of foam concrete only increases.

Advantages of building houses from foam blocks:

  • Fast construction time (from 70 days),
  • Mechanical strength, resistance to stress,
  • High thermal insulation and sound absorption,
  • no shrinkage,
  • vapor permeability,
  • Reliability and durability.

One of the main advantages of foam block houses is the cost. They do not need a powerful foundation and the use of expensive special equipment, do not require additional thermal insulation. The material is easily processed: it can be chipped, sawn, milled, giving the required shape. This allows you to implement any architectural and design solutions.

Order a foam block house in the company "Dachny Sezon"

On our website projects of houses from foam blocks, developed by specialists of the company "Dachny Sezon" are presented. For each of them, drawings, photos of already built objects, as well as detailed description works in three available configurations: "Basic", "Optimal" and "Turnkey". Additionally, you can order the carrying out of facade and internal finishing works, installation of gutters, filing the roof with spotlights, installation interior doors and laying of intra-house engineering systems. The prices in the catalog do not include the porch, terrace and balconies.

Advantages of ordering a house in the company "Dachny Sezon":

  • 15 years of work in the field of low-rise construction,
  • over 2500 completed projects,
  • internal redevelopment - FREE OF CHARGE,
  • timber from the direct manufacturer,
  • staged payment - 1% - 14% - 20% - 20% - 20% - 20% - 5%,
  • 940 finished projects ranging from 60 to 500 m2,
  • free delivery of materials within 100 km from the Moscow Ring Road,
  • technical supervision at all stages,
  • warranty period - 7 years.

Dachny Sezon is a full cycle company. On our own, we carry out the whole range of work - from preparation project documentation before waste disposal and commissioning of the facility. You can also order an individual design of a building for your requirements from us or buy an inexpensive project of a house from foam blocks without execution construction works. For a consultation call: +7(499) 650–50–18.