Maintenance and overhaul in educational institutions. An example of an estimate for the repair of a room, important points in drawing up an estimate for the repair of technological equipment at school

We will send the material to you by e-mail

The long-awaited renovation in the apartment! In order for you not to hate it in a couple of years, you need to prepare for it. An example of an estimate for the repair of a room will help with this, because such data will show how much and in what volumes you need to invest to get your dream home. This is not just a list of purchases, but a whole document that can be entrusted to specialists, but here be prepared to inflate costs. You can also successfully compose it yourself, it is only important to know how.

The estimate includes all expenses, calculates any unforeseen costs, including the services of specialists in different areas. In order to make a budget, you need:

  • Take room measurements. This includes the height and length of all walls, the length of wiring, cables, plumbing and heat communications, if any, will be included in the repair. After receiving information on dimensions, it is possible, which will become the basis for calculating the necessary draft and finishing materials. It is important to have data on the area of ​​\u200b\u200bthe walls, floor and ceiling.
  • Based on the data obtained, it is necessary to carry out the calculation of rough materials - make a margin of at least 5-10% in this case.
  • Next comes the selection and miscalculation of the necessary decorative materials.
  • Now the most interesting and exciting part: price monitoring. You need to know how much rough and finishing materials cost, the cost of the services of a designer and a team of repairmen, plumbers, electricians and other specialists who may be involved in the repair process. It is best to draw a table and indicate several options for each item - this will allow you not to make a mistake with the choice.


All the data received must be recorded, and then put into one table: this way you will have a work plan + the cost of materials and the cost of paying for the work of specialists. It is also necessary to indicate the timing of the work, and if the injection of funds will be partial, then their dates of such receipts.

Nuances

The estimate is not only technical information, it includes an element of creativity. The technical aspect is at least minimal knowledge of the processes that will occur during the repair, understanding the market building materials what is needed for what.


Creativity is the competent distribution of all cost items in accordance with the needs at a particular stage of work. It is important to take a balanced approach to choosing a team, if you trust this to specialists. Don't be fooled by low prices- it is likely that the quality will be the same there. It is better to make an estimate yourself, the minimum data and numerous templates will help you with this. Why is it better to do it yourself? Everything is very simple: when ordering an estimate from a construction company, you will surely get a 20 or even 30% larger amount than it actually is. If you doubt the truth of the data, then you may well use the services of another "specialist" - these are auditors. As practice shows, the cost of the estimate will decrease by no less than 10%.

Examples

The photo below is an example of an estimate for a kitchen renovation. All types of jobs are categorized for your convenience. Such options for estimates for the repair of a room will help you navigate and quickly find out how much money will go to individual parts.

Separate subsections are dismantling work. When carrying out a major overhaul, there will be a need to dismantle not only or old finishes, but also pipes, including sewer pipes. And given that plumbing is connected in the apartment, these works will also affect the bathroom. It is rational to carry out repairs in the bathroom / toilet and kitchen together: this way you can save money. This is followed by the processing of walls, floors and ceilings. It can be seen here that black and Finishing work listed in one table, we would recommend separating them.

Also an important stage in the preparation of estimates for is the installation of plumbing. If it is better to weld the riser to specialists, since you have decided to use their work, then it is quite possible to connect the mixer yourself, no serious skills or complex tools are needed for this.


As you can see, there are columns with units of measurement, areas and lengths of all work items. For ease of calculation, the price per unit of work and then the total cost are indicated. The estimate will draw out more funds if you instruct construction company purchase of materials. But be careful here: replacement is often practiced quality materials and components for low-grade. Therefore, it is important to control every stage of the work.

The following is an approximate estimate for the repair of the entire apartment, there is a slightly different compilation scheme, but the meaning is the same. That is, the unit prices and the total cost of the work are indicated. As you can see, here the customer, most likely, will entrust the company with the purchase of materials, a special column is allocated for this, although it is possible for him to purchase himself, and enter this data for clarity. Here is a more detailed study. Pay attention to the last point: the customer even took into account the cost of lowering construction waste, which is also important when carrying out a major overhaul.

An example of an estimate for the repair of an apartment

Summer is the season for renovations. educational institutions. For this period, as a rule, current and capital repair work. The form of their financing depends on what type of work will be performed. In the article, we will consider the difference between conducting current repair from capital and how repair work should be reflected in accounting.

Making a decision to repair

One of the main documents that should be followed in preparing for the repair of buildings and structures is the Regulations on the organization and conduct of reconstruction, repair and Maintenance buildings, communal and socio-cultural facilities (together with VSN 58-88 (p)) approved Order of the State Committee for Architecture under the Gosstroy of the USSR dated 11/23/1988 No. 312 (hereinafter - VSN 58-88 (p)).

According to the rules of this document ( clause 3.2 VSN 58-88 (p)) the institution should monitor the technical condition of buildings and facilities by conducting systematic scheduled and unscheduled inspections using modern technical diagnostic tools, which, in turn, will help to decide on the need for one or another type of repair work.

Scheduled inspections are divided into general and partial. During general inspections, the technical condition of the building or the object as a whole, its systems and external improvement should be monitored, with partial inspections - the technical condition of individual structures of the premises, elements of external improvement ( clause 3.3 VSN 58-88 (p)).

Unscheduled inspections are carried out after natural disasters (earthquakes, mudflows, rainstorms, hurricane winds, heavy snowfalls, floods and other phenomena) that can cause damage to individual elements of buildings and facilities after accidents in heat, water, power supply systems and when deformations of the bases are detected ( clause 3.4 VSN 58-88 (p)).

According to clause 3.5 VSN 58-88 (r) general inspections should be carried out twice a year: in spring and autumn.

During the spring inspection, it is necessary to check the readiness of the building or facility for operation in the spring-summer period, establish the scope of work to prepare for operation in the autumn-winter period, and clarify the scope of repair work on buildings and facilities included in the current repair plan in the year of the inspection.

During the autumn inspection, it is necessary to check the readiness of the building or object for operation in the autumn-winter period and clarify the scope of repair work on buildings and objects included in the next year's current repair plan.

During general inspections, it is also necessary to monitor the fulfillment by tenants and tenants of the terms of employment and lease agreements, if any.

The results of the inspections should be reflected in the documents on the registration of the technical condition of the building or object (registers of the technical condition, special cards, etc.). These documents must contain:

  • assessment of the technical condition of a building or object and its elements;
  • identified faults;
  • their location;
  • the reasons for these failures;
  • information about the repairs carried out during the inspections.
Generalized information about the condition of a building or object should be reflected annually in its technical passport ( clause 3.9 VSN 58-88 (r)).

According to the definition given in annex 1 to VSN 58-88 (r), building renovation is a complex construction works and organizational and technical measures to eliminate physical and moral deterioration, not related to changes in the main technical and economic indicators of the building.

Let's deal with the definitions of maintenance and overhaul, which are also given in Appendix 1 to VSN 58-88 (r):

Maintenance should be carried out at intervals to ensure efficient operation building or object from the moment of completion of its construction (overhaul) until the moment of putting on the next major overhaul (reconstruction). At the same time, natural and climatic conditions must be taken into account, Constructive decisions, technical condition and mode of operation of a building or object ( clause 4.1 VSN 58-88 (r)).

Works that should be attributed to current repairs are listed in Appendix 7 to VSN 58-88 (r). This list is large enough to name most of the repairs that cover the entire building from the foundation to the roof, including exterior and interior decoration, as well as all engineering communications.

Overhaul should include troubleshooting of all worn elements, restoration or replacement (except for the complete replacement of stone and concrete foundations, bearing walls and frames) to more durable and economical, improving the performance of buildings under repair. At the same time, an economically feasible modernization of a building or facility can be carried out: improving the layout, increasing the number and quality of services, equipping the missing types of engineering equipment, landscaping the surrounding area ( clause 5.1 VSN 58-88 (p)).

The list of additional works performed during the overhaul is given in Appendix 9 to VSN 58-88 (r). It is not as big as the list of ongoing repairs. According to him, major repairs include:

  • inspection of buildings and preparation of design budget documentation(regardless of the period of repair work);
  • equipment with cold and hot water supply, sewerage, gas supply systems with connection to existing main networks with a distance from the input to the point of connection to the mains up to 150 mm;
  • transfer of the existing power supply network to increased voltage;
  • installation of fire-fighting automation and smoke removal systems;
  • change in the design of roofs;
  • equipment of attic premises of residential and non-residential buildings for exploitation;
  • insulation and noise protection of buildings;
  • replacement of worn-out elements of intra-quarter engineering networks;
  • repair of built-in premises in buildings;
  • examination of design and estimate documentation;
  • architectural supervision of design organizations;
  • technical Supervision.
According to clause 5.2 VSN 58-88 (p) as a rule, the building (object) as a whole or its part (section, several sections) should be put up for major repairs. If necessary, major repairs of individual elements of a building or facility, as well as external improvement, can be carried out.

Determining the cost of work

To carry out repair work based on the results of the inspections, it is necessary to draw up a defective statement. The form of this document is not legally approved, therefore it can be developed by the institution itself, taking into account the requirements for primary accounting documents specified in Art. 9 of the Federal Law of 06.12.2011 No.402-FZ "On Accounting", and fix it in the appendix to the accounting policy.

Based on the defective statement, a decision is made to carry out current or major repairs. In the event that minor repairs are carried out by the institution itself, then in the future the necessary materials are purchased and work is carried out.

If a decision is made to carry out current repairs by the contractor, then according to clause 4.4VSN 58-88 (r) for this, the principles of pricing and the procedure for payment for the work performed, provided for overhaul, should be applied.

In turn, in accordance with clause 5.7VSN 58-88 (r) determination of the cost of capital repairs of objects should be carried out on the basis of estimated or contract prices. The contractual price of each repair object should be determined on the basis of an estimate compiled according to the prices, norms, tariffs and rates established for the overhaul, taking into account the scientific and technical level, efficiency, quality, terms of work and other factors. The estimates must include overhead costs, planned savings, other work and costs.

The estimate documentation should provide for a reserve of funds for unforeseen work and units, distributed into two parts:

  • intended to pay for additional work caused by clarification of design solutions in the course of repair or reconstruction (customer's reserve);
  • intended to compensate for additional costs arising in the course of repair or reconstruction when changing the methods of performing work against those accepted in the estimated norms and prices (contractor's reserve).
The total of the estimates should indicate the refundable amounts - the cost of materials from the dismantling of structures and the dismantling of engineering and technological equipment, determined on the basis of the standard output of materials and products suitable for reuse at repair facilities.

The development of design and estimate documentation for the overhaul and reconstruction of buildings (objects) should include ( clause 5.8VSN 58-88 (r)):

  • conducting a technical survey, determining the physical and obsolescence of design objects;
  • drawing up design estimates for all design decisions for redevelopment, functional reassignment of premises, replacement of structures, engineering systems or their re-arrangement, landscaping and other similar works;
  • feasibility study for major repairs and reconstruction;
  • development of a project for the organization of major repairs and reconstruction and a project for the production of works, which is being developed by a contractor.

Work financing

Financing of the current and capital repairs of state-owned educational institutions will be carried out in accordance with the budget estimate, and budgetary and autonomous institutions - at the expense of subsidies for other purposes or subsidies for the implementation of state tasks.

Target financing of current and capital repairs is carried out within the framework of various federal programs. So, for example, within the framework of the federal program for the modernization of regional systems of preschool education in 2014 in accordance with Decree of the Government of the Russian Federation dated January 14, 2014 No.22 the procedure for the provision and distribution of federal subsidies to regional budgets, including for the maintenance and overhaul of preschool educational institutions, has been determined.

When placing orders for maintenance and overhaul, autonomous institutions must comply with the requirements Federal Law of July 18, 2011 No.223-FZ "On the procurement of goods, works, services by certain types legal entities» and the developed Procurement Regulations, and state and budgetary educational institutions - all the procedures provided for federal law dated 05.04.2013 No. 44-FZ "On the contract system in the field of procurement of goods, works, services to meet state and municipal needs", regardless of whether a contractor is involved in these works or materials are purchased for repair work by the institution.

Recall that educational institutions have the right to a simplified procedure for concluding contracts with a single supplier, if the price of such a contract does not exceed 400,000 rubles. ( pp. 5 p. 1 art. 93 Federal Law No.44-FZ).At the same time, the total annual volume of purchases, which the customer is entitled to make on the basis of this paragraph, should not exceed 50% of the amount of funds provided for the implementation of all purchases of the customer in accordance with the schedule, and should not exceed 20 million rubles. in year.

Reflection in the accounting of repair work

Slight differences in accounting for repairs will depend on whether outside contractors are involved. Let's consider two options:
  1. Repairs are carried out by the institution itself.
  2. The repair is carried out by a contractor.
With the 1st option, as a rule, only a purchase is made necessary materials. With the 2nd - the cost of materials is included in the cost of the work performed.

The cost of current and major repairs does not increase the cost of the repaired buildings and structures themselves.

According to Directions No.65n the purchase of consumables (construction and finishing) materials is carried out by the institution for subsection 340"Increase in the cost of inventories" KOSGU.

Settlements with contractors for payment for services for the repair of buildings and structures will be carried out at the expense of subsection 225"Works, services for the maintenance of property" KOSGU.

The organization and conduct of repair work in accounting will be reflected on the basis of primary accounting documents (an act on the write-off of inventories (form 0504230), an act on the acceptance and delivery of repaired, reconstructed, modernized fixed assets (form 0306002), etc.) public institution in accordance with Instruction No.162n , budget institution - Instruction No.174n, and an autonomous institution - Instruction No.183n .

The purchase of materials from suppliers and their write-off for the needs of the institution will be reflected in the accounting as follows:

Government institutionState-financed organizationAutonomous institution
DebitCreditDebitCreditDebitCredit
Procurement of materials for repairs
1 105 34 340 1 302 34 730 0 105 34 340 0 302 34 730 0 105 34 000 0 302 34 000
Write-off of materials used for repairs
1 401 20 272 1 105 34 440 0 401 20 272

0 109 хх 272

0 105 34 44 0 401 20 272

0 109 хх 272

0 105 34 000

When repair work is performed by the contractor, the following accounting entries will be made in the accounting of institutions:

Government institutionState-financed organizationAutonomous institution
DebitCreditDebitCreditDebitCredit
Reflection of debt to the contractor
1 401 20 225 1 302 25 730 0 401 20 225

0 109 xx 225

0 302 25 730 0 401 20 225

0 109 xx 225

0 302 25 000
Prepayment to the contractor
1 206 25 560 1 304 05 225 0 206 25 560 0 201 11 610 0 206 25 000 0 201 11 000
Final settlement with the contractor
1 302 25 830 1 304 05 225 0 302 25 830 0 201 11 610 0 302 25 000 0 201 11 000
Advance payment offset
1 302 25 830 1 206 25 660 0 302 25 830 0 206 25 660 0 302 25 000 0 206 25 000

Let's look at a few examples.

The state educational institution, within the framework of the current repair, made a replacement on its own floor covering in the dining room. For these purposes, linoleum was purchased in the amount of 40,000 rubles. 100% advance payment to the supplier.

These business transactions will be reflected in the budget accounting as follows:

The budgetary educational institution, at the expense of the target subsidy, made a major overhaul of the facade of the building. The cost of the work amounted to 2,000,000 rubles. According to the contract, a 30% advance payment is provided. Upon completion of the work, an act of completed work was signed and the final settlement with the contractor was made.

These facts of economic life in the accounting of a budgetary institution will be reflected as follows:

Contents of operationDebitCreditAmount, rub.
Made an advance payment to the contractor under the contract

(2,000,000 rubles x 30%)

5 206 25 560 5 201 11 610 600 000
Accounted for by the contractor 5 401 20 225 5 302 25 730 2 000 000
The offset of the previously transferred advance payment was made upon completion of work 5 302 25 830 5 206 25 660 600 000
The final settlement with the contractor was made after the signing of the certificate of completion

(2,000,000 - 600,000) rub.

5 302 25 830 5 201 11 610 1 400 000

To determine the need for current or major repairs, the institution must monitor the technical condition of buildings and conduct systematic inspections for this. Before starting repairs, it is necessary to carry out procurement or contract procedures in accordance with applicable law and determine the sources of financing for the planned activities. Depending on the chosen forces and means of carrying out repairs, these facts of the economic life of the institution are subject to reflection in budget or accounting records.

Major repairs of the building are carried out to improve its appearance and operational properties. Over time, building structures lose their original appearance, and the state of engineering systems may become unusable. Modern building technologies allow not only to completely replace old engineering equipment with new ones, but also to change the appearance of the building beyond recognition.

Overhaul of buildings and structures implies a cycle of work to replace worn-out fragments with improved and more economical ones. In this way, the operational capabilities of the building are improved, extending its service life. During major repairs, some objects can be restored or partially replaced. A complete replacement is not carried out for structures that have a very long service life: concrete and stone foundations, building walls, wall frames, underground pipes, etc. It is important to understand that major technical and economic indicators of the building are not affected during major repairs. Changing the dimensions of the object and its parts, as well as the replacement of load-bearing structures are related to reconstruction work.

There are complex overhaul and selective. The first type of overhaul means work to replace structural elements, engineering systems. These works cover the entire building as a whole. Selective overhaul involves the complete or partial replacement of some structural parts of a building or equipment that have become unusable. The type of overhaul is assigned after determining the technical condition of a building.

building renovation contract

The contract is mandatory. This document states:

  1. Subject of the contract.
  2. Cost of work, terms of payment.
  3. Responsibility for the parties:
  • customer obligations;
  • contractor's obligations.
  1. Deadline for repairs.
  2. Force majeure situations.
  3. Manufacturing jobs.
  4. Acceptance of the object after the completion of repair work.
  5. Guarantees.
  6. Arbitration.
  7. Property liability of the customer and contractor.
  8. Termination of an agreement.
  9. special circumstances.
  10. Details of the parties, legal address.

Estimates for the overhaul of the building - one of the important documents involved in the organization of repair work. The estimate indicates the cost of the cost of work, where all expenses are detailed: wage, taxes, household expenses payment for consumables, etc.

Before proceeding to the process of organizing a major overhaul, both parties need to familiarize themselves with the existing norms, rules and laws that may be useful when carrying out work: SNiP, OKPD, OKVED, OKDP, etc. Possessing all the necessary knowledge, the risk of conflict, force - major situations between the customer and the contractor.

Many schools in our city were built during the Soviet Union. Any building that has been in operation for several decades needs timely repairs. When it comes to the lives of children, their health and safety cannot be risked by ignoring the need for major repairs.

The opening of the school after a major renovation will certainly inspire students and teachers, because it is pleasant to be and conduct the educational process in a new, stylish, modern school environment. In addition, after a major overhaul, you can not worry about the health of students and school staff. Replacing old windows and doors will eliminate the problem of drafts. Also, during the overhaul, floors and walls are updated, electrical wiring, plumbing and many other outdated, faulty facilities are being adjusted. Schools after major repairs look unrecognizable! The big advantage of a major overhaul in the school is that you can not worry about troubles such as:

  • peeling plaster and paint;
  • uneven walls, floor;
  • drafts;
  • cold, damp rooms;
  • untidy interior and exterior
    and etc.

List possible works school renovation

During the major renovation of the school, the following works can be carried out:

  1. Foundation:
  • partial shifting (no more than 10%), strengthening of the stone foundation, basement walls;
  • restoration of isolation;
  • restoration of the blind area near the building (more than 20% of its total area);
  • repair of drainage near the building;
  • replacement of single pillars made of stone, concrete.
  1. Walls, columns:
  • putty cracks;
  • repair of structures reinforcing stone walls;
  • laying of brick cornices, parapets, etc.;
  • re-laying of individual parts of stone walls (no more than 20% of the total volume of masonry);
  • strengthening clips;
  • repair of columns or their partial replacement (no more than 20% of the total volume);
  • replacement of in-wall accumulators with a stone, metal, reinforced concrete frame (no more than 40%).
  1. Partitions:
  • repair, replacement of partitions;
  • during the above works, partial redevelopment is allowed with the expansion of the area of ​​\u200b\u200bpartitions no more than 20%.
  1. Roofing, covering:
  • full or partial replacement of the old coating with a new one;
  • full or partial replacement of beams, runs, crossbars;
  • repair of load-bearing structures of lanterns, searchlights;
  • full or partial replacement of wall slopes, gutters, coverings chimneys and other devices.
  1. Floors, floors:
  • replacement, repair of interfloor ceilings;
  • replacement of individual obsolete elements of interfloor ceilings with new ones;
  • strengthening of interfloor ceilings;
  • partial (more than 10% of the total area) or complete replacement gender;
  • floor refurbishment.
  1. Windows, doors:
  • replacement of window and door blocks;
  • replacement, strengthening of stairs.
  1. Internal works (facing, plastering, painting):
  • repair of plaster (more than 10% of the total area);
  • replacement of cladding (more than 10% of the total area);
  • anti-corrosion coating of metal structures.
  1. Facades:
  • cladding repair (more than 10% of the total area);
  • restoration of plaster (more than 10%);
  • restoration of cornices;
  • sandblast cleaning;
  • replacement of obsolete parts of balconies and fences.
  1. Central heating:
  • full or partial replacement of boiler equipment;
  • repair of foundations above boilers;
  • boiler room automation.
  1. Ventilation:
  • replacement of air ducts, fans;
  • replacement of electric motors, ventilation ducts, heaters, filters, etc.
  1. Plumbing, sewerage:
  • full or partial replacement of the pipeline;
  • replacement of insulation;
  • replacement of pumping units of pumping systems, pressure tanks.
  1. Hot water supply:
  • replacement of boilers, coils;
  • replacement of pipelines, pumping units of pumping systems, tanks, insulation.
  1. Electrical networks, communication:
  • replacement of fittings, hooks, traverses, wires;
  • repair, replacement of cable boxes;
  • repair, replacement of grounding devices.
  1. Electric lighting, communication:
  • replacement of unusable parts of the network (more than 10%);
  • repair of cable channels;
  • replacement of safety shields;
  • replacement of lamps with other types.
  1. Roads for cars:
  • repair of drainage, drainage devices;
  • repair of fixing, protective structures of the subgrade;
  • repair, replacement of concrete slabs;
  • equalization cement concrete pavement asphalt concrete.

How to write justifications for the overhaul of the school building, plans, estimates?

Answer

The rationale for the overhaul of the school building is the results of the technical survey. It determines the degree of its physical and moral deterioration, the need for repair and reconstruction work.

To conduct such a survey, it is necessary to involve a specialized organization under a civil law contract for the performance of work.

<…>In accordance with paragraph 5.8 of the Regulations on the organization and implementation of the reconstruction, repair and maintenance of residential buildings, communal and socio-cultural facilities (VSN 58-88 (r)), approved. By order of the State Committee for Architecture of November 23, 1988, the development of design estimates for the overhaul and reconstruction of buildings (objects) should include:

  • conducting a technical survey, determining the physical and obsolescence of design objects;
  • drawing up design estimates for all design decisions for redevelopment, functional reassignment of premises, replacement of structures, engineering systems or their re-arrangement, landscaping and other similar works;
  • feasibility study and;
  • development of a project for the organization of major repairs and reconstruction and a project for the production of works, which is being developed by a contractor.<…>

The preparation of the listed documents requires engineering and survey work, and, accordingly, the required level of qualification. Such a survey is carried out by a specialized organization under an agreement with an educational organization.

Consequently, the establishment of the need for a major overhaul of the school building is established based on the results of a technical survey, determining the degree of physical and moral deterioration of the building. The contract for the technical survey may also provide for the preparation of design estimates, a feasibility study and a work project.

A technical examination of the physical condition of a building can be carried out in accordance with GOST 31937-2011 "Buildings and structures. Rules for the inspection and monitoring of the technical condition", put into effect by Order of Rosstandart dated December 27, 2012 No. 1984-st.

Repair work at the school is carried out regularly, before the start of each new school year. The educational institution should meet the children clean and tidy so that the children like to visit it.

Renovation of the school is a large-scale event that requires solid costs. There are many premises here and all of them are operated intensively throughout the year. In order to correctly calculate the amount of the cost of school repairs, it is imperative to draw up a detailed estimate, which will include all finishing and other repair work.

Estimates for school renovations

Like any other, the school renovation estimate includes:

  • The list of works to be done and the costs associated with their implementation
  • List of necessary building materials (in names and in quantitative terms)
  • The cost of building materials per unit of measurement

At the end of the estimate, the total amount of expenses for the repair of the educational institution is summed up.

The calculation of the estimate for such an object as a school is necessarily carried out taking into account the Unified other norms and prices for construction, installation and repair and construction work and correction factors. The market price cannot be taken into account, as it will be difficult to justify it in the budget expenditure report.

Before starting to draw up an estimate for the repair of an educational institution, it is necessary to first work out in detail the architectural part of the project (design of the premises, building facades).

Drawing up a budget for repairs

The calculation of the estimate for school repairs depends on what task the owner of the object sees in front of him (that is, what type of repair is planned). If we are talking about the overhaul of the building and its premises, then it may contain the costs of the following types of work:

  • Redevelopment of premises
  • Roof repair
  • Full or partial replacement of communications
  • window replacement
  • Facade repair.

Estimate for finishing the school ( redecorating) does not involve large expenses, it usually provides for extremely inexpensive finishing work:

  • Painting windows and doors
  • Glazing
  • Wall decoration with wallpaper
  • Floor painting or linoleum replacement.

The list of works and materials for their implementation is negotiated with the customer before the final estimate is drawn up. A competent estimator is able to calculate the estimate, adjusting it to any budget (if the amount for its implementation has already been determined). At the request of the customer, he can reasonably “cut off” or “wind up” the expenditure part of the estimate to the required amount.

A ready estimate for repairs is the main tool for monitoring the subsequent work of contractors providing construction services.

Qualified assistance in budgeting

The creation of estimates is sometimes entrusted to representatives of construction organizations, which are subsequently engaged in the repair of this object. In the case of school renovations, this is not always an acceptable option. The amount of estimated expenses is usually required already at the stage of planning the budget of an educational institution for the new calendar year.

The amount of funding needed for repairs can be calculated in advance. This will help a specialist who is professionally involved in the creation of estimates.