Strengthening the clip of the balcony slab estimate. What does the estimate for the repair of a balcony or loggia consist of? Sample estimate for draft material
In Soviet times, almost no one paid attention to the balcony. In other words, there it is, okay. For many, it then served as a smoking area or an area where you can place objects that are not subject to frost and precipitation.
But time passed, and the 90s came. And then more and more people began to pay attention to these extra square meters. Someone began to consider the balcony as an additional cellar, since they had to survive only at the expense of their crops. Someone wanted to make an additional warm room in the apartment from the balcony and use it, for example, for an office. And someone decided to combine the summer room with an adjacent room in order to increase the size of the latter.
All the desires described above are present in people today. And their implementation, as then, is impossible without converting the balcony into a loggia. And this already requires some financial costs. The only question is: "Which ones?"
In order to be able to figure out how much money will be needed to repair the loggia, below is an example of an estimate for this event.
Loggia parameters taken into account in the estimate:
- Area - 5.1 sq.m.
- Ceiling height - 2.8 m.
- Glazing of the loggia - 1.7x4.2 m or 7.14 sq.m.
- Glazing from the side of the room - 4.05 sq.m.
Plan
An example of an estimate for the repair of a loggia
Note: the estimate shows the average prices for Russia for 2015.
Estimated is one of important documents from which the repair, construction or reconstruction of any object begins. Drawing up an estimate for the repair of an apartment is a mandatory procedure, which is primarily necessary for the Customer. This fundamental document must be prepared as an annex to the contract.
ORDER APARTMENT REPAIR
The calculation of the estimate for the repair of apartments is carried out by a specialist - an estimator. To begin with, our specialist goes to the repair site, inspects the premises, makes measurements of the premises, gets acquainted with the condition of the floors, ceilings, walls, windows and doors, finds out the individual wishes of the Customer and receives the terms of reference.
Based on all the information received and the measurements made of the premises, project documentation and an estimate is made for overhaul apartments. You can do without an estimate, perhaps, only if you carry out a small redecorating or partial renovation of the interior. But still, an estimate is always needed, a description of the types of work tied to the estimate gives an undeniable number of advantages when working on construction site during the renovation. Thanks to the prepared preliminary estimate, the Customer receives detailed information on the list of types of work and materials necessary for the repair, and also sees the exact calculation of the cost of these finishing works and materials.
Typical commercial estimate does not look like an Excel spreadsheet, which must indicate the types of work, units of measurement and cost. Our company uses the services of experienced estimators, we also constantly monitor the prices of building materials, which allows us to significantly save money.
You, as a customer, have the ability to control the progress of work and cost items. When choosing a contractor for work, it is the analysis of the estimate that gives a complete picture of the cost of the work and allows you to evaluate the professionalism of the contractor.
We can immediately tell you that the prices for complex repairs are much lower than for individual types of work. Each order is individual! The cost of services depends on the types of work and their volume. Moreover, the larger the volume, the lower the price for repair and finishing work.
Sample estimate for finishing work
No./Pos |
Name of works |
unit. |
Quantity |
Price, rub |
Amount, rub |
Demolition works, garbage disposal |
|||||
cleaning |
|||||
Cleaning walls to concrete (from wallpaper, putty) |
|||||
Ceiling cleaning to concrete (high-quality paint, putty |
|||||
Cleaning the floor to concrete (from the old coating) |
|||||
Other dismantling |
|||||
Dismantling the plinth |
|||||
Taking out the trash |
|||||
Removal of construction debris |
|||||
Electrical work |
|||||
Wiring of electrical, telephone and television networks in walls and ceilings |
|||||
Installation of sockets, switches, spotlights, machines |
|||||
Wall plastering and floor leveling (screed) |
|||||
Primer for concrete walls and ceilings |
|||||
Leveling ceilings (improved plaster) |
|||||
Wall leveling (improved plaster) |
|||||
Painting works |
|||||
Wall putty |
|||||
Ceiling putty |
|||||
wall pasting vinyl wallpaper |
|||||
Ceiling painting water-based paint in 3 layers |
|||||
Cleaning and painting pipes with heat-resistant paint |
|||||
carpentry |
|||||
Ceiling cornice laying, puttying and painting (styrofoam or polyurethane, width up to 3 cm) |
|||||
Tiled work |
|||||
masonry ceramic tiles on the floor |
|||||
Cleaning |
|||||
Multiple cleaning throughout the repair and after the repair |
|||||
Total finishing work: |
|||||
CUSTOMER |
CONTRACTOR |
||||
__________ |
__________ |
Sample estimate for draft material
No./Pos |
Name |
unit. |
Estimated price, rub |
Estimated amount, rub |
|
Materials for the main estimate |
|||||
Mix plaster "Rotband" |
|||||
Mix Betonokontakt, 5kg |
|||||
Insulating tape |
|||||
Mounting boxes |
|||||
Junction boxes |
|||||
Alabaster G-5 ( gray color) by 20kg |
|||||
Copper wire in double insulation PUNP 3x1.5 |
|||||
Copper wire in double insulation PUNP 3x2.5 |
|||||
Putty "Vitonit-LR" (Fin.) |
|||||
Ready-made finishing putty SHEETROCK 5.6kg (3.5l) ready putty |
bucket 3.5l |
||||
Deep penetration primer, canister 10l |
|||||
Latex-based water-based paint Fincolor Euro-7, white matte 9l |
|||||
Glue for tiles Fliesenkleber KNAUF (Fliesen KNAUF), 25kg |
|||||
Polyethylene roll 3 m wide |
|||||
Dowels, screws, self-tapping screws, nails, bolts and other fasteners |
|||||
Consumables and auxiliary materials, one-time tools |
|||||
Total for building and finishing materials |
|||||
Transportation, loading, overheads, contingencies, tool depreciation, budgeting, etc. from the cost of materials |
|||||
Total with transport costs and other expenses |
|||||
Dismantling, construction and finishing works, garbage removal |
|||||
|
TOTAL Estimated Costs |
|
|
|
59749 |
CUSTOMER |
CONTRACTOR |
||||
__________ |
__________ |
For an approximate calculation of the cost of repairing premises, use our online calculator. On our online repair cost calculator, you can calculate the approximate cost of repair work with draft materials. You just need to choose the type of repair (redecoration, overhaul, renovation), select the name of the room in which you are going to make repairs, then enter the area of \u200b\u200bthe room in square meters by gender, and the rest online calculator he calculates everything himself and gives out in the column Total Estimated estimated cost of your refurbishment.
Room renovation cost calculator - online
If you do not want to manually calculate the floor area or you did not understand something when describing the calculations, then you can use our calculator and calculate floor or ceiling area automatically.
For the calculation it is necessary measure in meters length, width of the room and enter the data in order by filling out the form and you will automatically receive a calculation floor or ceiling area in square meters.
Floor and ceiling area calculator
H We will not load you with tedious mathematical calculations. You only need to measure the basic parameters, and the wallpaper calculator will approximately calculate the required number of wallpapers for your room. Those who want more accurate calculations and measurements can read the article above. How to calculate how much wallpaper you need.
A sample of a ready estimate for repair and finishing work in an apartment with a total area of 64 m2, a new building at the address: Residential Complex "Mkr.Finsky-Potapovo 3A".
Estimate No. 4 for repair and finishing work
Estimate for the purchase of rough materials
№ | Name of works | Unit rev. | Qty |
Rate in rubles |
Price in rubles |
Dismantling works | |||||
1 | Ceiling stitching (rust) | l.m. | 8 | 150 | 1200 |
2 | Dismantling sockets, switches, lamps | PC. | 12 | 75 | 900 |
3 | Dismantling the electrical panel assembly | PC. | 1 | 650 | 650 |
Total: | 2 750 | ||||
Construction works | |||||
1 | Laying of partitions from tongue-and-groove blocks or foam concrete up to 100 mm thick | sq.m | 5,8 | 420 | 2436 |
2 | Metal jumper device | l.m. | 2 | 280 | 560 |
3 | Block bath screen device | PC. | 1 | 1100 | 1100 |
4 | Steam-thermal insulation device ("penofol", "penoplex") balcony - floor, ceiling, walls | sq.m | 27 | 360 | 9720 |
5 | Coating thermal insulation device "Akterm" | sq.m | 0 | 180 | 0 |
6 | Waterproofing of joints adjacent to the street | sq.m | 6 | 185 | 1110 |
Total: | 14 926 | ||||
Painting and plastering works | |||||
1 | Plastering of walls (by lighthouses) up to 20 mm | sq.m | 25 | 385 | 9625 |
2 | Alignment of walls (as a rule) up to 10 mm - rooms, kitchen, corridor, pantry | sq.m | 154,5 | 200 | 30900 |
3 | Alignment of ceilings (as a rule) up to 10 mm kitchen, hallway, pantry, balcony | sq.m | 28 | 250 | 7000 |
4 | Seal of ceiling seams (rust) | l.m. | 8 | 150 | 1200 |
5 | Surface primer (2 coats) ceiling, walls | sq.m | 0 | 60 | 0 |
6 | Finishing grinding of surfaces - ceiling, walls | sq.m | 0 | 45 | 0 |
7 | Putty ceilings for painting (complex of works) kitchen, hallway, pantry, balcony | sq.m | 28 | 350 | 9800 |
8 | Painting ceilings with high-performance paint for 2 times | sq.m | 28 | 180 | 5040 |
9 | Puttying walls for painting (a set of works) | sq.m | 154,5 | 280 | 44805 |
10 | Wall painting with high-performance paint for 2 times | sq.m | 154,5 | 140 | 21630 |
11 | Plastering window slopes up to 300 mm | l.m. | 15 | 260 | 3900 |
12 | Puttying slopes for painting (a set of works) | l.m. | 15 | 280 | 4200 |
13 | Painting slopes with high-quality paint for 2 times | l.m. | 15 | 180 | 2700 |
14 | Installation of painting corners arched with sealing seams and joints | l.m. | 22 | 65 | 1430 |
15 | Painting pipes up to 50 mm in diameter | l.m. | 26 | 120 | 3120 |
Total: | 145 350 | ||||
Joinery and carpentry | |||||
1 | Installation door block(ready set) | PC. | 5 | 3000 | 15000 |
2 | Installation of rack ceilings (up to 10 sq.m) | sq.m | 4,4 | 880 | 3872 |
3 | Installation of plastic window sills up to 300 mm | l.m. | 4,5 | 750 | 3375 |
Total: | 22 247 | ||||
Tiled work | |||||
1 | Wall cladding with tiles (size 250-250 mm) bath, toilet | sq.m | 25 | 850 | 21250 |
2 | Hatch installation | PC. | 1 | 418 | 418 |
3 | Tile hatch device (with installation of the mechanism) | PC | 1 | 1100 | 1100 |
4 | Laying tiles on the floor (size 300-300 mm) bath, toilet, balcony | sq.m | 10 | 700 | 7000 |
5 | Drilling holes in tiles | PC. | 12 | 160 | 1920 |
6 | Grouting ceramic tiles (monocolor) | sq.m | 35 | 100 | 3500 |
7 | Tiled thresholds | l.m. | 1 | 1000 | 1000 |
Total: | 36 188 | ||||
Floor arrangement | |||||
1 | Floor waterproofing in bathrooms | sq.m | 4,4 | 185 | 814 |
2 | Leveling screed device up to 3 mm | sq.m | 54,4 | 150 | 8160 |
3 | Laminate installation (with underlay) | sq.m | 54,4 | 280 | 15232 |
4 | Nut installation | l.m. | 3 | 150 | 450 |
5 | Installation of skirting boards | l.m. | 65 | 130 | 8450 |
Total: | 33 106 | ||||
Ventilation work | |||||
1 | Insert into the ventilation duct | PC. | 1 | 319 | 319 |
2 | Installation of a ventilation duct (up to 2 m) | PC | 2 | 1650 | 3300 |
3 | Fan installation (with connection) | PC. | 2 | 308 | 616 |
Total: | 4 235 | ||||
Heating | |||||
1 | Alteration of the heating radiator connection unit | PC. | 3 | 4500 | 13500 |
2 | Installing a heating radiator | PC. | 3 | 1500 | 4500 |
3 | Removal / installation of the radiator for finishing work (without dismantling the bracket to the finished place) | PC. | 3 | 500 | 1500 |
Total: | 19 500 | ||||
Plumbing work | |||||
1 | Temporary water supply device | set | 1 | 1650 | 1650 |
2 | Plumbing fixture | l.m. | 6 | 600 | 3600 |
3 | Seal of plumbing | l.m. | 6 | 120 | 720 |
4 | Installation of fine filter with pressure regulator | PC. | 2 | 1400 | 2800 |
5 | Collector installation (set of works) | PC. | 2 | 2000 | 4000 |
6 | Pipe laying CHGV (m / layer, p / propylene, p / ethylene) | l.m. | 26 | 270 | 7020 |
7 | Pad sewer pipes(PVC) | l.m. | 5 | 330 | 1650 |
8 | Pipe insulation | l.m. | 26 | 50 | 1300 |
9 | Installation storage water heater(boiler) | PC. | 1 | 3300 | 3300 |
10 | Installation of the toilet bowl "Compact" | PC. | 1 | 2805 | 2805 |
11 | Installation of "moidodyr" | PC. | 1 | 3000 | 3000 |
12 | Mixer installation | PC. | 1 | 850 | 850 |
13 | Installation of a hygienic shower | PC. | 1 | 850 | 850 |
14 | Installing a heated towel rail | PC. | 1 | 3300 | 3300 |
15 | Bath installation | PC. | 1 | 3700 | 3700 |
16 | Mounting the tub mixer on the bar | PC. | 1 | 1250 | 1250 |
Total: | 41 795 | ||||
Electric installation work | |||||
1 | Penetration device up to 30x30 mm | l.m. | 16 | 275 | 4400 |
2 | Shtrab | l.m. | 16 | 35 | 560 |
3 | Cabling | l.m. | 255 | 50 | 12750 |
4 | Installing the socket box (with socket device) | PC. | 33 | 300 | 9900 |
5 | Installation of a surface-mounted electrical distribution board | PC. | 2 | 650 | 1300 |
6 | Installation of circuit breakers, differential automatic devices, RCDs | PC. | 12 | 250 | 3000 |
7 | Installing a socket, switch | PC. | 30 | 130 | 3900 |
8 | Installation of TV, Telephone, Internet sockets | PC. | 3 | 180 | 540 |
9 | Installation of TV, Telephone, Internet splitter | PC. | 1 | 280 | 280 |
10 | Installing a built-in (spot) lamp | PC. | 6 | 200 | 1200 |
11 | Electric underfloor heating device | sq.m | 2 | 750 | 1500 |
12 | Installation of underfloor heating relay | PC. | 1 | 350 | 350 |
13 | Marking electrical installation sites (without a project) | PC. | 33 | 35 | 1155 |
Total: | 40 835 | ||||
Total for work: | 360 932 | ||||
Total for estimate No. 4: | 360 932 |
Table No. 1 consumption of rough material.
Table No. 1 for the consumption of building and finishing rough material in an apartment with a total area of 64 m2, a new building at the address: LCD "Mkr. Finnish-Potapovo 3A".
Examples of samples of the table for accounting for the consumption of rough material
№ |
Name material |
pcs/m2 bags |
price |
general price |
1 | Mix "Rodband" with a layer thickness of not more than 2 cm | 87 | 370 | 32190 |
2 | Sand concrete M300 with a screed layer thickness of not more than 5 cm | 145 | 160 | 23200 |
3 | Beacon plaster 0.6 | 45 | 40 | 1800 |
4 | Plaster beacon 1.0 | 12 | 45 | 540 |
5 | Betokontakt "EURO" | 3 | 1350 | 4050 |
6 | Primer "Prospectors" | 5 | 450 | 2250 |
7 | Foam block No. 5 in pieces | 6 | 45 | 270 |
8 | Foam block No. 7 in pieces | 84 | 55 | 4620 |
9 | Drywall moisture resistant 12 | 2 | 370 | 740 |
10 | Gypsum putty "Fugenfuhler" | 1 | 750 | 750 |
11 | Mounting adhesive for blocks "Perlfix" | 3 | 320 | 960 |
12 | Glue tile "Flizen" | 6 | 350 | 2100 |
13 | Self-leveling floor "Prospectors" | 8 | 320 | 2560 |
14 | Putty "Vetonit" LR+ | 9 | 750 | 6750 |
15 | Gossamer "Oscar" 50m2 | 1 | 1150 | 1150 |
16 | Profile 27/28 "Knauf" | 6 | 100 | 600 |
17 | Profile 60/27 "Knauf" | 4 | 130 | 520 |
18 | Finishing putty "Pro Form" | 1 | 1350 | 1350 |
19 | Pendant "Knauf" | 40 | 20 | 800 |
20 | Film -150 density | 60 | 50 | 3000 |
21 | Beam 50/50 planed | 3 | 200 | 600 |
22 | Board 150/20 planed | 3 | 300 | 900 |
23 | Trash bags | 120 | 10 | 1200 |
24 | Glue for gossamer "Oscar" | 1 | 1350 | 1350 |
25 | Coating waterproofing "Ceresit 65" | 6 | 750 | 4500 |
26 | Rule 2.5 | 1 | 500 | 500 |
27 | Rule 2.0 | 1 | 400 | 400 |
28 | Rule 1.5 | 1 | 300 | 300 |
29 | Dowel nail 60/40 | 2 | 250 | 500 |
30 | Grid facade 160 density | 1 | 1250 | 1250 |
31 | Putty "Uniflot-Knauf" | 1 | 1100 | 1100 |
32 | Bucket 12 liters | 2 | 120 | 240 |
33 | Bucket 20 liters | 2 | 180 | 360 |
34 | Basin 60 liters | 1 | 350 | 350 |
35 | Paper masking tape | 5 | 70 | 350 |
36 | Scotch packaging | 2 | 70 | 140 |
37 | Self-tapping screws 0.35 universal | 2 | 130 | 260 |
38 | Self-tapping screws 0.65 for wood | 1 | 130 | 130 |
39 | Self-tapping screws 0.75 for wood | 1 | 130 | 130 |
40 | Self-tapping screws 0.25 universal | 2 | 130 | 260 |
41 | Paint corner galvanized | 18 | 35 | 630 |
42 | Alabaster in bags | 1 | 280 | 280 |
43 | Silicone in a tube | 1 | 140 | 140 |
44 | Glue in tube "FixAll" | 1 | 420 | 420 |
45 | Crosses 1.5 for tile joints | 4 | 100 | 400 |
46 | Wedges for tile joints | 2 | 100 | 200 |
47 | Cable NUM 3/1.5 "Sevcable" | 100 | 35 | 3500 |
48 | Cable NUM 3/2.5 "Sevcable" | 150 | 47 | 7050 |
49 | Cable NUM 3/4 "Sevcable" | 36 | 82 | 2952 |
50 | Cable NUM 3/6 "Sevcable" | 5 | 95 | 475 |
51 | Corrugation 16 | 100 | 3 | 300 |
52 | Corrugation 20 | 200 | 4 | 800 |
53 | Internet cable "FTP" | 10 | 22 | 220 |
54 | TV cable "SAT 703" | 40 | 25 | 1000 |
55 | Telephone cable "KSPV" | 10 | 12 | 120 |
56 | Crab TV 1/3 | 1 | 250 | 250 |
57 | Insulating tape | 1 | 40 | 40 |
58 | Perforated tape | 1 | 180 | 180 |
59 | Lamp 150v | 5 | 40 | 200 |
60 | Sockets for concrete | 50 | 10 | 500 |
61 | Automatic 10 amp. "ABB" | 2 | 150 | 300 |
62 | Automatic 16 amp. "ABB" | 3 | 150 | 450 |
63 | Automatic 25 amp. "ABB" | 5 | 150 | 750 |
64 | RCD "ABB" | 1 | 1250 | 1250 |
65 | DIF automatic 25 amp. | 1 | 1350 | 1350 |
66 | Armature 12 | 3 | 220 | 660 |
67 | ||||
68 | Material lifting "in tons" | 8 | 1500 | 12000 |
69 | Delivery of materials "gazelle" | 4 | 1500 | 6000 |
70 | Total: | 147 787 |