We decide over time - when it is better to dig a well. When is it better to dig a well: features of winter and summer work At what time can you dig a well

If you decide to entrust the difficult task of arranging water supply to a specialized organization, then the question of when it is better to dig a well will not even arise for you. As a rule, in the arsenal of such companies there is equipment designed for any time of the year. If you intend to handle the work yourself, clear planning will not be superfluous.

  • Determine the best time to dig a well
  • What will the stars say
  • water exploration
  • When to dig a well
  • When not to dig a well
  • Features of work in winter time
  • Video: features of the arrangement of wells
  • Determine the best time to dig a well

    To shovel tons of earth and not find water as a result is very annoying. So that dirty and hard work is not in vain, it is necessary to take into account many factors.

    The arrangement of the well is not a matter of one day

    What will the stars say

    Many gardeners and gardeners check their affairs with the clues of the planets and distant stars, and in some cases this behavior yields very generous results. For those who want to know when to dig a well lunar calendar, we inform: the best period for work comes during the growing moon. It is optimal if at that time she is in the sector of one of the signs of the water elements, and ideally if in Pisces. At such times the level ground water reaches the minimum mark, and the water intake will subsequently not dry out. The rest of the advice will be of a purely practical nature, without a touch of mysticism.

    By the reflection of the sky on the water surface of the well, you can determine how evenly the rings are installed.

    water exploration

    by the most the best way to determine where it is better to dig a well remains exploration drilling. Geological surveys are carried out at any time of the year and give accurate results. Exploration shows not only the presence of underground sources, but also reveals the composition of the soil and its bearing capacity. Why are these metrics so important? If the soil is not dense enough, the installed concrete rings can simply sink into the ground.

    If for some reason you cannot call a specialist, contact folk omens. According to our grandfathers and great-grandfathers the best place for the well is located where:

    • A large number of bumps-tubercles are growing. This relief is typical for lowland areas.
    • Dew falls more abundantly than in other areas.
    • There are lonely oaks (pay attention - not oak groves!).
    • Birches, maples, willows lean to one side - the branches point to an underground source.
    • Grass even in the hottest time remains thick and juicy.
    • Columns of midges are circling at sunset. But the anthill with red inhabitants, on the contrary, indicates that there is no water here.
    • The fog rolls low. This usually happens in places of former swamps.

    Important! You can conduct an independent study of the water saturation of the soil. To do this, take a few ceramic bricks, weigh them on accurate scales, record the results and bury the samples at various locations on the site to a depth of about half a meter. After a day, remove and weigh the bricks. In the place where the specimen with the largest weight gain was found, you can dig a well.

    When to dig a well

    When is the best time to dig a well? Experts consider the optimal interval when groundwater ebb from the surface of the earth and go to depth. The water intake equipped at this moment will always be full in the future. Reflections are not devoid of logic: if you managed to get to moisture in such a difficult time, then in the “rainy season” you will not suffer from dehydration of the source. A classic rookie mistake is to stop working as soon as the well starts to fill up. If the moment is chosen unsuccessfully (read - the groundwater was high), then after a while the well will be dry and it will have to be deepened to a new level.

    Special equipment reduces the complexity of the process

    So when is it better to dig a well: in autumn or spring? Groundwater goes deep either during dry periods or with the onset of severe frosts. Digging in winter is still a pleasure. Of course, in middle lane In Russia, the ground rarely freezes to a considerable depth (the average level is 1.2 meters), but more effort will still have to be made. It will be necessary to clear snow drifts and warm up the soil well. Therefore, the optimal time for carrying out "excavations" is considered to be the end of August and the early beginning of autumn (until the torrential rains begin). In these months, the outflow of groundwater has already started, and additional difficulties associated with the weather are not yet expected.

    The end of winter (before the start of active snowmelt) is also considered a favorable period. If the shaft of the future water intake passes through the area of ​​quicksand, then you will have to dig at the time of frost. To equip such a well at another time is unlikely to succeed.

    When not to dig a well

    The most unfortunate time to take up the water supply of the site falls on the rainy periods of early spring and late autumn. However, this postulate applies to any time of the year, if it rains for several days. Firstly, working in the mud is not entirely pleasant, and it can be dangerous for health. Secondly, the rise in the level of groundwater can play a cruel joke, which we have already mentioned above.

    Important! If you'll be digging the well yourself, it's best to schedule this activity during your vacation. The work will take a lot of time and it is better to carry it out "on the job".

    Features of work in winter

    When is the best time to dig a well in the country? For a number of reasons, this is best done in winter:

    • The groundwater level is at the optimum level.
    • There are usually no problems with attracting labor.
    • There are seasonal discounts on the necessary materials.
    • The dacha or personal plot is free from green spaces and agricultural machinery.
    • It is easier for gardeners to find time to equip a well - there is no need to be distracted by caring for the beds.

    You can also dig wells in winter.

    For most regions of Russia, the months from December to March can be the best time to conduct earthworks. The only difficulty is the removal of the upper frozen layer of soil - it is warmed up and dug out or chipped off with chops. If you plan to turn to professionals, then there will be no difficulties at all. On the contrary, many companies provide discounts for work in the off-season, and queues line up for them in the summer.

    After clearing the top layer, work is carried out according to the classical algorithm:

    • Mark the area. Please note that the diameter of the well should be 10 cm larger than the size of the concrete rings.
    • Dig a hole large enough to immerse the first ring (it should protrude 10-15 cm above ground level).
    • Install the concrete rim in the pit and check the correct location - there should be no distortions.
    • Build up the second ring and secure it with staples.

    Internal seams must be sealed

    • Deepen the hole, digging it in a circle, until the first tier sinks into the ground under the pressure of its own weight. Remove excess soil from the center of the structure.
    • Seal the joints with hemp and cement mortar.
    • Repeat the procedure until water appears at the bottom of the shaft. After that, cover the mine with a lid and leave for a day. If there are severe frosts, it is necessary to wrap the lower tiers with some kind of insulation.
    • Check the water level - a one and a half meter column is considered the norm.
    • Pump out the accumulated liquid and pour in the bottom filter: 15 cm of fine gravel and 40 cm of coarse gravel (can be replaced with crushed stone).
    • Fill the outer perimeter (the distance between the walls of the shaft and the concrete rings) with a mixture of sand and gravel.

    Important! To protect the well from the ingress of melt and rain water, it is necessary to make a clay castle. To do this, tamp the earth around the rings with a layer of clay and sprinkle sand on top.

    Video: features of the arrangement of wells

    The arrangement of the water intake takes a lot of time and requires certain skills. It is almost impossible to cope with this task alone. If you doubt your own abilities, it is better to turn to specialists. They will tell you when it is better to dig a well and carry out the work quickly and efficiently.

    Our services:

    1. Industrial wells, compared to conventional wells developed by private contractors or small companies, are designed for greater productivity, for example, providing water supply to a large manufacturing enterprise, or even a small settlement. The dimensions of industrial wells on average can reach 500 meters in depth and a diameter of 5 meters or more. One of their main advantages is an increased flow rate, which is about 100 cubic meters per hour. With such a range of features, such wells are in high demand in oil refining areas, as well as providing water supply to small residential...
    2. Independent examination in Moscow The main types of examinations carried out: Technical examination - a study of the quality of industrial equipment......
    3. The construction of an autonomous water supply on the site begins with the choice of a hydraulic structure. It can be a well or a well of any type. The main thing is that drilling and development do not undermine the owner's budget and do not take too much time, and the finished structure is as productive as possible. If geological conditions allow, site owners stop at a well-needle, because. this is the most profitable option. […]...
    4. Regardless of the depth, flow rate, intensity of water intake, the well and the installed water supply equipment need additional protection. There is no way to visually control the level, purity, water pressure, compliance of the electrical network indicators with the reference ones. Properly selected, installed and configured automation for well pump- this is the protection of electrical equipment, which significantly increases the service life of water supply devices. ContentsAutomatic well protection: types of systems Protection with […] ...
    5. The water supply of a private house from a non-centralized source is already familiar - the time of buckets with rocker arms has irretrievably gone. Theoretically, laying a water pipe and connecting a well to it are simple actions: they equipped a caisson, dug trenches, laid pipes in them, installed a storage tank on the way, connected everything, not forgetting to screw on the taps, set up automation - and water went. This is true, but in [...]
    6. Arrangement of water supply for a country or suburban area almost always flies a pretty penny. If there is no central sewerage and is not expected, it is difficult to dig a well, and there is no money for an artesian, it's time to remember the old low-cost technology. Do-it-yourself Abyssinian well is a simple and fairly reliable way to provide yourself and loved ones with clean water. ContentsWhat is an Abyssinian well The principle of operation [...] ...
    7. A classic well is the most affordable way to provide the site with the necessary amount of water. The use of moisture from the upper aquifers without laboratory tests is permissible only for irrigation and construction work. It is possible to obtain a shallow water intake suitable for drinking only in an ecologically clean area, remote from all polluting sources: roadbeds, industrial facilities, fields treated with chemical fertilizers. Contents Types of wells: [...] ...
    8. To the physico-chemical processes of cleaning industrial Wastewater include: coagulation, flocculation, extraction, sorption,......

    If you need to dig an effective well that can last for decades, then our company is the leader in this business and it is best to order the service from us. We take care of creating a deep and reliable source of water on your site, you just have to choose the time.

    If you cannot decide what time to dig a well, there are several factors that you should pay attention to, namely: the type of soil and the time of year. Next, we will talk in more detail about choosing the ideal time.

    The choice of time to dig a well based on the type of soil

    Most often in our regions there are two types of soil: sandy and clay. The complexity of the work depends on the soil, so it is worth considering both options in more detail.

    • Sandy. This type of soil is ideal in order to quickly dig a well, if your site has sandy soil, then you can start work at any time of the year.
    • Clayey. In such soil, it is better to dig a well in winter or spring. In winter, it can become a serious problem and slow down digging work. In clay soil, it is better to choose.

    If you are going to dig a well, without the use of any equipment, then it is very important to take into account the type of soil in which the work will be carried out. Involving a specialized company that has everything you need to work in any type of soil, more attention should be paid to the time of year.

    What time of year to dig a well?

    There is constant debate about when is the best time to dig a well. However, it is fair to say that any season has both its advantages and disadvantages. First of all, you need to choose the time when the water goes deep underground. Those digging in early spring, when the meltwater raises the water level quite high, run the risk of seeing an empty well during periods of drought or severe frost.

    It is high frosts that lead to the fact that the water goes deep underground. This is main reason Why is it better to dig a well in winter. Our company recommends this time of year to create deep wells that will provide water to a large area. For work in frozen ground, special drilling machines are used, for which the hardness of the earth is not an obstacle. If you choose this particular time of the year, then in the frozen well water will be collected gradually, depending on the intensity of the thawing of the soil, and you will never have a problem of lack of water.

    Also, dry summer periods are a good time to dig a well. Firstly, at such a time, moisture goes deep enough, digging in which, you will always be provided with water. Secondly, when installing a well in dry ground, you make it more stable and durable. These two factors explain why it is better to dig in the summer, however, in this case, it is very important to have experienced craftsmen from our company who know exactly what depth is the most acceptable for water to be in the well all year round.

    If you do not take into account the dry and frosty periods of the year. Tu is best to dig in late August, early September. Do not start work after heavy rains, it is necessary that the earth dries out a little.

    The cost of creating a reliable well

    Many try to save money on the well and try to do everything themselves, from buying all necessary materials and ending with digging. As a result, such a well can not only float, but also quickly dries up. With this approach, in a few years it will be necessary to think about creating a new source of water.

    Our company offers a full range of works to create a deep and durable well. The price in Moscow for such work depends on several factors: the depth of the well and the method of digging the mine (by hand or by machine).

    Wells-Digging

    The presence of a suburban area sooner or later prompts its owners to equip a well to provide water supply. And one can hardly envy the residents of summer cottages in which a centralized water supply system has been installed: we all imagine what quality the water flows through it. That is why many people prefer not to risk their health by abandoning too hard or too soft, sometimes rusty or simply undrinkable water, in favor of a natural well.

    Among other things, in a huge number of SNT and cottage settlements, there are simply no communications. In this case, digging a well is a must. Also, we are regularly approached for the installation of septic tanks from reinforced concrete rings on the site, for the same reason.

    Having decided to equip an underground water source on their site, the owners immediately face the following question: “when to dig a well?”. Only specialists can give an answer to it, since the time for the construction of an underground source on the site and its choice depends on many factors, which will be discussed in this article.

    If you are going to entrust this responsible business to a specialized organization, then you will not have to guess the time to start the work process. In this case, qualified specialists and professional special equipment will instantly cope with unforeseen problems, if the arrangement of the well occurred at an inopportune period. Professionals will masterfully determine how deep you need to dig.

    When is it better to dig a well on the site: season

    In the case of a well, there are no time limits - drilling can be done at any time of the year, however, the approach of equipment on soft ground is fraught with its jamming and damage to the road. The construction of a well is also possible all year round, except for a short period of 2-3 weeks during the spring flood. There is no ideal time of year for this work, but if you do it in winter or dry summer, you can be 200% sure that there is enough water. As a rule, seasonal fluctuations in the water level reach one to two meters. Digging a well in winter is also possible, and seems not to be challenging task as it may seem from the outside.

    If you decide to find out from different companies when they dig wells and whether they do it in winter, then remember that some specialists are not mentally and physically ready to work in cold weather. Although it is this period and the time after it that is the ideal time for “reconnaissance” of the occurrence of groundwater, the level of which is close to what happens only in strong heat. And if water is found in frost or heat, then it will always be present on the site.

    Considering that the digging of the well must be carried out continuously, we try to complete all the work in one day or, at most, two days. The work is carried out directly by our teams, without any intermediaries, so we can agree on any day convenient for you, on weekdays or weekends. You don't have to take a vacation to completely dedicate to arranging the well - just entrust this task to professionals with relevant experience. So you will be absolutely calm that everything is going according to plan and nothing will have to be redone.

    By ordering the arrangement of an underground source from the Wells-Digging company, you will save yourself from exorbitant troubles and avoid additional financial and time costs for organizing the water supply of your site. We will provide you not only with clean and really tasty water, but also with maximum freedom of movement around the site, as well as a convenient location of the well.

    - an important and responsible occupation that affects the subsequent provision of water to the entire household. Before starting these works, one should not only stock up on the necessary equipment and materials, but also correctly determine the time of year when digging will be carried out. When and at what time is it better to dig a well in the country? Let's try to figure it out.

    Factors affecting the start time of work

    What is the best time of year to dig a well? - this question is asked by many homeowners who dream of having individual water supply on their own plot.

    When choosing the right time, the following conditions should be taken into account - the structure of the soil and the level of groundwater rise.

    Soil structure

    The choice of the location of the structure often depends on the structure of the soil located here.

    If it is soft, then the work will be carried out easily! It is more difficult to dig a spring in winter, since loamy and clayey soil is practically impossible to dig due to the effect of low temperatures.

    As a result, most site owners begin to install well hydraulic structures in summer or autumn. If the soil is sandy, then you can dig a well on it even in winter, easily reaching the deep horizons.

    Level of groundwater rise

    The level of water underground at different times of the year is different: in spring it is higher, and in winter it is lower. It is easier to dig a spring if the soil is not overly saturated with groundwater, as this reduces the risk of the aquifer drying up. Therefore, the worst time to carry out the described activity is early spring with its abundant floods. in summer it usually goes well, since the soil contains a minimum of moisture, and the air warms up quickly.

    Seasonal fluctuations in the level of groundwater are the main factor that you should pay attention to when carrying out earthworks. At the same time, you can not wait a whole year until the required season, but you should carefully monitor the weather conditions.

    Comparison of seasons when digging a well

    A country well is dug not when its homeowner “wants” it, but when weather and seasonal conditions contribute to this. It is known that a well is dug up to an aquiferous sandy layer, resting all its necessary structures in a retaining clay horizon. In this case, the mine will be located in the upper water-resistant layer, which can protect the lower horizons from perched water.


    Usually, perched water spills occur in case of heavy rainfall (in autumn or summer) or as a result of floods (in spring).

    You can make a well in the country both in winter and in summer. Each of these seasons has its own advantages and disadvantages. For example, it is more difficult to dig a mine in winter, since although the earth rarely freezes to great depths, it is possible to work at low temperatures and the wind is always uncomfortable.

    Unlike winter time, digging a well in summer is much more comfortable, but with heavy rainfall there will be a lot of perched water that can pollute the entire source.

    Many people postpone the described case to the beginning of autumn (in "Indian summer"), when there is no employment for personal plot And low level ground water. During this short period, they try to dig a well of the required depth so that it can be filled with water as much as possible in the upcoming rainy season.

    Astrological factors for digging a well

    Few people know, but according to ancient beliefs, location can influence the digging of a well. celestial bodies.

    According to the advice of astrologers, the phase of the growing moon is the best period for digging a well. It is desirable that it be in the constellation "Pisces", as this is the sector of water elements.

    It has long been noticed that at this time, no matter what the chosen place is, there is a meager degree of saturation of the soil with moisture. Naturally, it is not always possible to carry out the indicated algorithm of work when the moon is in "fish".
    Relying only on ancient beliefs and astrological observations when digging a water well is impractical!

    professional workers they accurately determine not only the place for the well, but also the corresponding time of the year when the amount of groundwater is optimal for the described work. It is allowed to dig a water source on your own, but it will take more time and effort.

    Choosing the month of digging a well

    Even experienced workers of professional water well drilling services recommend starting the specified work at a certain period of the year. At the same time, it is taken into account that groundwater goes down and then re-seeps into the prepared recess. It is important that they can better filter through the lower horizons, otherwise there will be dirty water in the dug out source.

    To carry out the described work in autumn or spring also depends on the weather. For example, in March and April, there is instability in the level of perched water. After the snow melts, it usually worsens the digging process. If, at the same time, concrete rings are installed in the structure, then the latter can warp and “float”.

    It is allowed to dig a well in December or January, when groundwater occupies the lower level, but because of the bitter frosts, it is almost impossible to work. At the same time, there is a high risk not only of catching a cold, but also problems with determining the depth of the source, since the water is in lower layers.

    An example of how a well is dug in practice in winter:

    Very often, the digging of "winter" wells is done by coven workers who have no other income during this season of the year. Such hastily done work often requires digging, and this is not only a cost of effort, but also additional funds.

    Before entrusting the digging of a water well to strangers, you should make sure of their experience.

    Digging during the rainy season (June and July) is a waste of time. Due to the abundance of moisture, groundwater begins to rise, soaking the soil. As a result, a dirty slurry is formed, in which few people want to work. During a drought, the water level in the wells is minimal, so starting to dig a water well in August is the best time. It is also possible to carry out such work in September, when the weather is still dry and warm, and groundwater is in the lower horizons.

    Before digging a mine in the right month of the year, you should familiarize yourself with the level of fluid in the wells in neighboring areas. Thanks to this, you can determine the required depth of the future source, as a result of which, even in dry weather, there will always be water in your well.

    Choice of time for digging a well

    Determining how to dig a well over time is an important task, correct solution which will allow:

    • avoid unnecessary costs;
    • save yourself from carrying out empty work;
    • do the job quickly and efficiently;
    • have a full source of water on the site.

    When drilling a water well, it is easier to stumble upon a good aquifer in the warm, dry season. At the same time, the liquid must seep into the drilled shaft well and constantly. Due to this, even when using large volumes of moisture, its amount in the well will not decrease.

    Not recommended after heavy rains or during floods. At the same time, even sandy soil becomes supersaturated with water, which signals the end of digging. During a period of drought, this source will quickly dry up, since it is deprived of an abundant aquifer. It is because of this that one should not deal with this matter at the stage of saturation of the soil with moisture.

    February is also a favorable period for digging wells under the well. This is due to the predominance of low temperatures, which keep the process of snow melting and the absence of heavy rainfall. If the water intake shaft is located between the quicksands, it is recommended to dig during frosts. If you do it manually, you can use the old way - wooden shovels, to which the earth and other soil structures do not freeze.

    Up