You may also be interested in projects with similar parameters. Possible design changes

Total area: 87 m²

from 1 392 000 rub.


Possible installment for 12 months!


  1. Foundation
  2. frame
  3. Warming
  4. Floor insulation
  5. Plastic windows
  6. Interior doors
  7. Roof (metal tile)
  8. drains
  1. Exterior finish
  2. Interior decoration
  3. Installing email boiler
  4. Wiring
  5. Sewerage

The suite includes:

  1. Plumbing installation

Thank you, your order has been successfully sent. Our managers will contact you shortly.

Basic equipment

The basic package of the house includes:

  1. Foundation (tape monolithic with reinforcement, tape width - 200 mm, height - 600 mm. Foundation height from the ground - 400 mm. Bored piles - 12 pcs., depth - 1700 mm. With backfilling of the pillow with sand and vertical reinforcement with binding along strip foundation)
  2. frame (all structural parts of the frame are covered with an antiseptic)
  3. Warming external walls - 150 mm, interior walls- 50 mm. A vapor barrier is applied on both sides and gluing the joints - a liquid nail or a mounting adhesive sealant.
  4. Finishing of internal and external walls
  5. Floor insulation
  6. Plastic windows
  7. Entrance door(metal)
  8. Interior doors
  9. Walls and ceiling in bathroom. knots, bathroom and boiler room are sheathed with TsSP-9 mm, floor DSP-24 mm through depreciation. gasket.
  10. Roof (metal tile)
  11. drains

Full set

The complete package (turnkey) includes:

  1. Exterior finish (blockhouse, timber imitation. Door and window slopes. Color coating according to the design of the house and the customer's request)
  2. Interior decoration(lining xv. breeds A-B with sealing of slopes and moldings, skirting boards and fillets, installation of locks and latches-handles on the doors)
  3. Installing email boiler with wiring around the house for heating and installing batteries and a pump.
  4. Wiring with output for lamps, installation of boxes, switches, sockets and mounting block.
  5. Sewerage (Wiring around the house - bathrooms, bathrooms, kitchen. Without installation of sinks, bathtubs, toilet bowls, faucets, showers, jacuzzi and other equipment)
  6. Installation of a septic tank, overflow well, bleed pump
  7. The device of the blind area around the perimeter of the building

Luxury equipment

The suite includes:

  1. Plumbing installation (faucets, sinks, toilet bowls, bathrooms, showers, as well as installation of tiles in bathrooms, boiler rooms according to texture and color scheme at the request of the customer)

Frame house Texas 136 © CC BY Vladimir Pustokhod, 2017

The drawings were based on one of the projects from the exhibition area. Having stopped by with his family and “trying on” all the projects, Vasily decided that this is it, the house of their dreams. The dream turned out, of course, not small, but there was enough space for everyone in it: for mother, and for him and his wife, and for an adult daughter with her husband, and there was also a place for two grandchildren.

Also arranged a set of premises and sizes of rooms. Also a big plus was that the house had two full floors. And even the cost of the house in general suited.

Only one moment did not suit him - Vasily wanted the house to be built for him in stages: first a box, then they laid a heater and laid out communications, and then they did interior decoration, since he did not have enough of a certain amount to pay for everything at once, and during the time while the box was being erected and while it was standing, he wanted to save up the missing amount.

And three times more important - he wanted the frame to stand for several months - to get rid of excess moisture.


Ground floor plan frame house Texas 136 © CC BY Vladimir Pustokhod, 2017
Plan of the second floor of the frame house Texas 136 © CC BY Vladimir Pustokhod, 2017

This is where the main snag was ... First, the contractor was not interested in breaking down the construction into stages, and they offered to take out a loan for the missing amount at a rather high rate. Having not found mutual understanding, Vasily decided to build a house not only on his own, but to hire a team to build a house. Of course, with this approach, the drawings were not particularly required, but still he wanted to understand what was what, why and how much material might be needed at one stage or another. Yes, having drawings in hand is much easier to discuss certain changes with the team or send out some decisions on facades and decoration for miscalculation.


Texas frame house terrace 136 © CC BY Vladimir Pustokhod, 2017

As for the design solutions, the foundation was chosen screw piles, because of the speed and ease of installation. Although, of course, with their number of about 50 pieces, one could think about the MZFL tape, but I really did not want to get involved with concrete and reinforcement.


Texas frame house balcony 136 © CC BY Vladimir Pustokhod, 2017

Overlappings are assembled from a board 50x200mm. with insulation 200mm. Of course, for such a house, I would like to lay a little more, say 300mm, but since the house is planned to be used in summer cottage mode, and the financial issue still had an impact on the preparation of estimates, we decided to limit ourselves to such a layer. External and bearing walls are assembled from a board 50x150mm. with insulation 150mm. Maybe another 5 cm. insulation will be added by finishing the facade with the so-called thermal panels. And the partitions are made of boards with a section of 40x100 mm. with sound insulation 100 mm.


View of frame house Texas 136 © CC BY Vladimir Pustokhod, 2017

The assembly of frames and ceilings is facilitated by the fact that the house has two full floors, and each ceiling can be used as a kind of workbench for assembling the frames of the next floor. Some difficulties can be caused by the assembly attic floor and the installation of diagonal rafters (by the way, they are made composite), but a little patience, accuracy and following the instructions will allow you to cope with this stage. To facilitate the assembly process, the cuckoos above the balconies are assembled on top of the main rafters.